BLD19-03234
| FIRE-Final Inspection | 12/2/2019 | 12/2/2019 | 12/2/2019 3:30:38 PM | P | NR |
|
|
Not ready for final. Todd and I went over life safety requirements and it appears that a permit will be required for the fire alarm modifications needed due to the wall changes. Phone #: ###-#### Inspection requested via web by Todd Kurns
|
BLD19-02944
| FIRE-Final Inspection | 12/2/2019 | 12/2/2019 | 12/2/2019 2:00:28 PM | P | FAIL |
|
|
Repair the exit sign and mount the fire extinguisher in the basement as discussed.
Renae Phone #: ###-####
|
BLD19-04619
| FIRE-Final Inspection | 12/2/2019 | 12/2/2019 | 12/2/2019 1:59:50 PM | P | PASS |
|
|
life safety passed. Jim Phone #: ###-#### please call prior
|
FIR19-00290
| INSP-Sprinkler Rough-in/Hydro | 11/26/2019 | 12/2/2019 | 12/2/2019 11:13:34 AM | A | PART |
|
|
The sprinkler piping above the "clouds", in the second floor open area is ok for cover however it appears one pendant may need to be added due to 18' spacing on the current pendants. Also it does not appear the latest approved plans are on site since the changes in pipe routing are not shown.
Cole Bierman is the contact for this RTC and Hydro Inspection. He is hoping for an AM appointment. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00748
| INSP-Sprinkler Rough-in | 11/27/2019 | 12/2/2019 | 12/2/2019 10:50:07 AM | A | PART |
|
|
General rough-in passed. See the city approved drawings for corrections needed. Piping from top of riser to first main is shown to be 2 1/2" but 2" is installed, the uprights on one branchline have insulation/backing laying on them, one upright in the southwest corner of building exceeds 12" from roof deck, backflow installed is 3" where as the plans show 2 1/2" to be installed.
Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
BLD19-04664
| FIRE-Final Inspection | 11/22/2019 | 12/2/2019 | 12/2/2019 10:47:47 AM | A | PASS |
|
|
Life safety passed. Call for access- Deborah Phone #: ###-####
|