ELE99-04187
| Final | 12/17/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | A | PART |
|
|
###-#### R/I & P/S ok no final yet.
|
ELE99-03725
| Final | 12/17/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | A | FAIL |
|
|
FOR CONF INSP--LEE ###-#### RE-INSP FN Bond gutters and slide fix loose connector GFCI protect recep.
|
ELE99-04416
| Final | 12/17/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | A | PART |
|
|
APPROX 8:30 FN --PER JIM S---FRANK ###-#### P/S ok not ready for final no power.
|
ELE99-04375
| Final | 12/17/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | A | PASS |
|
|
###-#### ext 336 Final ok signed perm. Occ.
|
ELE99-04518
| Final | 12/17/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | P | FAIL |
|
|
dAN ###-#### Pigtail out grounds and use proper grounding screw.
|
ELE99-04491
| Electrical Rough-In | 12/20/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 08:54:20. Contact: ###-####. R/I ok.
|
ELE99-04483
| Electrical Rough-In | 12/20/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | P | PART |
|
|
Ken ###-#### Partial R/I ok JB required in laundry room.
|
ELE99-04246
| Final | 12/20/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | P | FAIL |
|
|
###-####; Harold. Circuit directory and ground jumper for recep. In raised cover.
|