ELE99-04510
| Rough-In Permanent Service | 12/17/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | A | FAIL |
|
|
IN THE UPSTAIRS FLOOR APT #4 DOOR SHOULD BE OPEN AT TOP OF REAR STAIRWAY MIKE JOHNSON ###-#### Fire damage work not completed, contractor will reschedule.
|
ELE99-04453
| Final | 12/17/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | A | PART |
|
|
FOR CONF --ROB-- ###-#### Conference; service panel installation.
|
ELE99-04519
| Final | 12/17/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | A | PASS |
|
|
don ###-#### Meter/main disconnect
|
ELE99-03029
| Final | 12/20/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 07:16:13. Contact: ###-####. Work not completed by contractor. Homeowner instructed to obtain permit for job completion.
|
ELE99-03029
| Final | 12/20/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | A | PASS |
|
|
Contractor did ELE R/I work only.
|
ELE99-04523
| Electrical Rough-In | 12/20/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 08:32:31. Contact: ###-####. Ele. R/I only.
|
ELE99-04445
| Electrical Rough-In | 12/20/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 09:22:07. Contact: ###-####. 1st floor Ele. R/I; interior walls.
|
ELE99-04527
| Electrical Rough-In | 12/20/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | P | FAIL |
|
|
bill ###-#### NEC 250-50 (c) concrete encased electrode required.
|
ELE99-04529
| Electrical Rough-In | 12/20/1999 | 12/20/1999 | 12/20/1999 12:00:00 AM | P | PASS |
|
|
wrk ###-#### home ###-#### OK.
|