Inspections for the day of: Wednesday, December 20, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01563 BLD-Foundation11/27/200012/20/200012/20/2000 12:00:00 AMAPART
found -tressel joe ###-#### need engineering to justafy #1 peir footing configuration w/ pipe under footting. 12/20/2000 2:03:03 PM
BLD00-01261 BLD-Framing/Rough-in12/19/200012/20/200012/20/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/19/2000 at 08:23:55. Contact: ###-####. interior sheer ok for cover soffit framing and raffter hangers pending re insp. 12/20/2000 1:50:14 PM
MEC00-04427 Rough-in12/19/200012/20/200012/20/2000 12:00:00 AMAPART
no p/t ###-#### call if there is a problem ok for rough in gas line to be instaled with frn. 12/21/2000 10:19:55 AM
BLD00-02437 BLD-Footing12/19/200012/20/200012/20/2000 12:00:00 AMAPART
Stan Wiggins ###-#### rebar ok pending special insp./ need engineering doc for sheer wall design at holddowns. 12/20/2000 11:28:29 AM
BLD00-02872 BLD-Framing/Rough-in12/20/200012/20/200012/20/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/20/2000 at 08:37:15. Contact: ###-####. ok to rock all but roof trusses repair not complet. 12/21/2000 8:10:12 AM
BLD00-03312 BLD-Framing/Rough-in12/20/200012/20/200012/20/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/20/2000 at 10:28:48. Contact: ###-####. exterior brace panels ok. 12/21/2000 8:43:55 AM
BLD00-02774 BLD-Final12/20/200012/20/200012/20/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 12/20/2000 at 11:20:50. Contact: ###-####.
BLD00-02532 BLD-Final12/20/200012/20/200012/20/2000 12:00:00 AMPPASS
###-#### final ok l/c isued. 12/21/2000 8:59:51 AM
BLD00-02590 BLD-Framing/Rough-in12/19/200012/20/200012/20/2000 12:00:00 AMPPASS
###-#### final ok for sign . 12/21/2000 9:09:23 AM
BLD00-01563 BLD-Concrete12/18/200012/20/200012/20/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/18/2000 at 07:27:37. Contact: ###-####. placed with special insp. pending report. 12/20/2000 10:17:33 PM need engineering for peir 1# pipe under footting. 12/20/2000 10:18:53 PM