Inspections for the day of: Wednesday, December 20, 2000.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03500 BLD-Footing12/19/200012/20/200012/20/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/19/2000 at 11:47:00. Contact: ###-####.
BLD00-03535 BLD-Footing12/19/200012/20/200012/20/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/19/2000 at 11:53:37. Contact: ###-####. need a soils report ftgs are on fill 12/19/2000 4:28:08 PM
MEC00-04407 Pressure Test12/19/200012/20/200012/20/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/19/2000 at 15:25:04. Contact: ###-####.
BLD00-02926 BLD-Framing/Rough-in12/20/200012/20/200012/20/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/20/2000 at 06:58:33. Contact: ###-####.
BLD00-03532 BLD-Foundation12/20/200012/20/200012/20/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/20/2000 at 07:01:22. Contact: ###-####.
BLD00-01229 BLD-Final12/20/200012/20/200012/20/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/20/2000 at 07:21:08. Contact: ###-####.c/n left on site 12/20/2000 11:07:28 AM
BLD00-03059 BLD-Framing/Rough-in12/20/200012/20/200012/20/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/20/2000 at 10:25:53. Contact: .
BLD00-02852 BLD-Framing/Rough-in12/20/200012/20/200012/20/2000 12:00:00 AMPPASS
SHEAR INSP JOHNNY ###-#### two shear panels by front door will be done after rough elec. panel will on inside walls 12/20/2000 2:05:56 PM
BLD00-03535 BLD-Footing12/20/200012/20/200012/20/2000 12:00:00 AMPFAIL
###-#### need soils report 12/20/2000 1:06:31 PM
BLD00-03536 BLD-Footing12/20/200012/20/200012/20/2000 12:00:00 AMPFAIL
###-#### need soils report 12/20/2000 1:06:50 PM
BLD00-03500 BLD-Foundation12/20/200012/20/200012/20/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/20/2000 at 06:05:56. Contact: ###-####.
BLD00-03501 BLD-Foundation12/20/200012/20/200012/20/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/20/2000 at 06:07:05. Contact: ###-####.
BLD00-03200 BLD-Framing/Rough-in12/19/200012/20/200012/20/2000 12:00:00 AMPPASS
###-#### 12/20/2000 2:04:01 PM