Inspections for the day of: Thursday, December 20, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01484 FIRE-Supply Line Hydro12/19/200112/20/200112/20/2001 12:00:00 AMACANC
###-#### CHRIS wrong type inspection 12/20/2001 7:41:33 AM
BLD00-01490 FIRE-Supply Line Hydro12/19/200112/20/200112/20/2001 12:00:00 AMACANC
###-#### CHRIS wrong type inspection 12/20/2001 7:41:03 AM
BLD00-01491 FIRE-Supply Line Hydro12/19/200112/20/200112/20/2001 12:00:00 AMACANC
###-#### CHRIS wrong type inspection 12/20/2001 7:41:17 AM
FIR01-00021 INSP-Alarm Testing12/20/200112/20/200112/20/2001 12:00:00 AMAFAIL
Scheduled by Inspector: 409 On 12/20/2001 6:20:07 AM need to complete basement alarm testing 12/21/2001 4:33:16 AM
BLD01-02581 FIRE-Final Inspection12/19/200112/20/200112/20/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 12/19/2001 at 09:23:18. Contact: ###-####. fire not required for sign off; called contractor and he will schedule for structural final 12/20/2001 7:31:12 AM
BLD01-01345 FIRE-Final Inspection12/19/200112/20/200112/20/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/19/2001 at 13:00:36. Contact: ###-####.
FIR01-00562 INSP-Sprinkler Rough-in/Hydro12/20/200112/20/200112/20/2001 12:00:00 AMPNR
UNDERGROUND\###-#### will reschedule for later date 12/20/2001 1:17:03 PM
FIR01-00474 INSP-Final Inspection12/20/200112/20/200112/20/2001 12:00:00 AMPPASS
Scheduled by Inspector: 409 On 12/20/2001 12:39:45 PM