FIR06-00292
| FIR-Aging Inspection | 12/20/2006 | 12/20/2006 | 12/26/2006 11:25:26 AM | | DONE |
|
|
wip
|
FIR05-00695
| INSP-Alarm Testing | 12/19/2006 | 12/20/2006 | 12/21/2006 8:56:23 AM | A | PART |
|
|
Alarm tested satisfactory for the 6th floor guest rooms and common corridor areas. Sprinkler monitoring, elvator lobby, FJ remain to be tested on this floor. Also retested defficiencies on the 7th floor, the added SD in room 728 has not yet been programed, signage is to be provided at the visible "door chime" in the HC accessible room, noted voice evac in the guest rooms does not function on general alarm.
|
BLD06-03412
| FIRE-Conference | 12/20/2006 | 12/20/2006 | 12/21/2006 8:47:31 AM | P | DONE |
|
|
|
FIR06-00421
| INSP-Final Inspection | 12/19/2006 | 12/20/2006 | 12/21/2006 8:46:43 AM | P | NR |
|
|
Project is not completed for final inspection at this time.
|
FIR06-00653
| INSP-Final Inspection | 12/19/2006 | 12/20/2006 | 12/20/2006 2:28:23 PM | A | DEFR |
|
|
No time to complete this inspection today, rescheduled per conversation with contractor.
|
BLD06-00384
| FIRE-Final Inspection | 12/20/2006 | 12/20/2006 | 12/20/2006 2:26:07 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR06-00270
| INSP-Final Inspection | 12/19/2006 | 12/20/2006 | 12/20/2006 2:25:38 PM | A | PASS |
|
|
Final fire alarm test is satisfactory, permit finaled.
|
BLD06-01354
| FIRE-Final Inspection | 12/19/2006 | 12/20/2006 | 12/20/2006 11:29:14 AM | A | DEFR |
|
|
No time available to complete this inspection today, to be rescheduled per agreement with contractor.
|
BLD06-01625
| FIRE-Conference | 12/19/2006 | 12/20/2006 | 12/20/2006 11:28:09 AM | A | DONE |
|
|
Confrence to discuss building addressing.
|
BLD06-00824
| FIRE-Conference | 12/19/2006 | 12/20/2006 | 12/20/2006 11:13:22 AM | A | DONE |
|
|
On site discussion regarding fire code review note requirements for fire lane marking at the looped access road.
|
BLD06-02699
| FIRE-Final Inspection | 12/19/2006 | 12/20/2006 | 12/20/2006 10:23:57 AM | A | FAIL |
|
|
Duct detectors are not powered to enable testing or functionality.
|
FIR06-00671
| INSP-Sprinkler Rough-in/Hydro | 12/19/2006 | 12/20/2006 | 12/20/2006 10:17:02 AM | A | PART |
|
|
Overhead hydrostatic test passed. Noted two heads at the entryway high ceiling area which exceed max. allowable 130ft/2 for this system, the FDC ball drip will not function properly as installed, missing one flex coupling at the 21/2 feed to the lower office area where it passes through the floor, ssu's below the stairs at two locations are not installed, the remainder of system rough-in appears acceptable.
|