Inspections for the day of: Wednesday, December 20, 2006.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02105 BLD-Conference12/20/200612/20/200612/20/2006 4:08:18 PMPPASS
Scheduled by a contractor via Hello! on 12/20/2006 at 10:01:32 AM. Contact: ###-####. Contractor has started on the first offfice bldg. Needs letter from engineer to delete special insp. requirements. Also noted to contractor that cold weather requirements willl be inforced for concrete const.
BLD06-02983 BLD-Footing12/20/200612/20/200612/20/2006 1:42:15 PMPPASS
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD05-01178 BLD-Energy code compliance12/19/200612/20/200612/20/2006 9:51:10 AMAFAIL
Scheduled by a contractor via Hello! on 12/19/2006 at 3:29:37 PM. Contact: ###-####. Remove nonrated box from seperation wall. fireblock furdowns. c/n posted. not ok to cover.
BLD05-01177 BLD-Energy code compliance12/19/200612/20/200612/20/2006 9:49:48 AMAFAIL
Scheduled by a contractor via Hello! on 12/19/2006 at 3:28:06 PM. Contact: ###-####. . Complete airseal package @ main level north wall. Openin g protection issues on 2nd floor @ rated wall, 2x6 does not allow for continous fire wall and are structurally insufficient. Needs to complete other items from previous c/n. New c/n posted. not ok to cover.
BLD06-02345 BLD-Final12/19/200612/20/200612/20/2006 8:55:36 AMAPASS
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD06-02345 DOC - Permit Finaled12/20/200612/20/200612/20/2006 8:55:26 AMPPASS