FIR09-00643
| FIR-Aging Inspection | 12/20/2010 | 12/20/2010 | 12/28/2010 2:44:10 PM | | PEND |
|
|
|
FIR09-00429
| FIR-Aging Inspection | 12/20/2010 | 12/20/2010 | 12/28/2010 2:43:05 PM | | PEND |
|
|
|
BLD10-01112
| FIRE-Final Inspection | 12/20/2010 | 12/20/2010 | 12/20/2010 5:17:06 PM | P | PART |
|
|
Pending project attatched FIR permit.
|
FIR10-00487
| INSP-Conference | 12/20/2010 | 12/20/2010 | 12/20/2010 5:16:08 PM | P | DONE |
|
|
Regarding inspection schedlue.
|
BLD10-00735
| FIRE-Conference | 12/20/2010 | 12/20/2010 | 12/20/2010 5:14:44 PM | A | DONE |
|
|
Regarding project finals.
|
BLD10-01564
| FIRE-Sprinkler Rough-in | 12/20/2010 | 12/20/2010 | 12/20/2010 5:13:48 PM | A | PART |
|
|
Okay to cover sprinkler work at the south end stairway intermediate landing.
|
FIR10-00410
| FIR-Aging Inspection | 12/20/2010 | 12/20/2010 | 12/20/2010 5:10:49 PM | A | DONE |
|
|
Inspection scheduled 12/21
|
BLD10-00842
| FIRE-Sprinkler Rough-in | 12/20/2010 | 12/20/2010 | 12/20/2010 5:06:17 PM | A | PART |
|
|
Okay to cover overhead fire sprinkler work at the first floor with the exception of the kitchen area as discussed.
|