FIR11-00627
| INSP-Final Inspection | 12/19/2011 | 12/20/2011 | 12/22/2011 11:16:39 AM | A | PASS |
|
|
permit finaled
|
BLD11-02386
| FIRE-Final Inspection | 12/19/2011 | 12/20/2011 | 12/20/2011 3:53:08 PM | P | FAIL |
|
|
Will be able to final life safety when the project related fire alarm permit is finaled.
|
FIR11-00670
| INSP-Final Inspection | 12/20/2011 | 12/20/2011 | 12/20/2011 3:51:04 PM | P | CANC |
|
|
canceled due to time constraints.
|
BLD11-02962
| FIRE-Final Inspection | 12/20/2011 | 12/20/2011 | 12/20/2011 3:48:35 PM | P | CANC |
|
|
canceled due to time constraints.
|
FIR11-00661
| INSP-Final Inspection | 12/20/2011 | 12/20/2011 | 12/20/2011 3:42:52 PM | P | FAIL |
|
|
The new horn/strobes that have been installed are not the devices that have been submitted. Also as-built plans were not provided as required due to the NAC errors. Provide a data sheet for the new devices to plan review and as-builts.
|
FIR11-00605
| INSP-Final Inspection | 12/20/2011 | 12/20/2011 | 12/20/2011 3:32:22 PM | P | PASS |
|
|
Permit finaled
|
FIR11-00643
| INSP-Final Inspection | 12/19/2011 | 12/20/2011 | 12/20/2011 3:32:00 PM | P | PASS |
|
|
Permit finaled. The hood suppression system functioned correctly.
|
FIR11-00579
| INSP-Sprinkler Rough-in/Hydro | 12/19/2011 | 12/20/2011 | 12/20/2011 2:02:58 PM | P | PASS |
|
|
24 hour air test and forward flush passed. First floor office area piping can be covered.
|
BLD11-02914
| FIRE-Final Inspection | 12/20/2011 | 12/20/2011 | 12/20/2011 12:16:36 PM | P | FAIL |
|
|
Not ready for inspection
|
BLD11-02695
| FIRE-Final Inspection | 12/19/2011 | 12/20/2011 | 12/20/2011 11:15:39 AM | P | PASS |
|
|
life safety passed. One additional smoke alarm needs to be installed outside of the sleeping room. Battery powered is ok. Building inspector please verify.
|
BLD11-02363
| FIRE-Final Inspection | 12/19/2011 | 12/20/2011 | 12/20/2011 10:46:48 AM | P | PASS |
|
|
life safety passed
|
FIR11-00663
| INSP-Final Inspection | 12/20/2011 | 12/20/2011 | 12/20/2011 10:21:42 AM | P | PASS |
|
|
permit finaled
|
FIR11-00607
| INSP-Sprinkler Rough-in | 12/20/2011 | 12/20/2011 | 12/20/2011 10:17:22 AM | P | PASS |
|
|
24 hr pressure test started 10:00 with 42 1/2 psi
|
FIR11-00621
| INSP-Sprinkler Rough-in/Hydro | 12/19/2011 | 12/20/2011 | 12/19/2011 2:44:31 PM | A | PASS |
|
|
UG supply line hydro test passed
|