BLD13-01287
| BLD-Wall cover | 12/19/2013 | 12/20/2013 | 12/20/2013 2:49:03 PM | P | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue3rd floor, north units, south vside only.
|
GCB12-00156
| GCB-Footing | 12/20/2013 | 12/20/2013 | 12/20/2013 2:48:07 PM | P | DEFR |
|
|
Herb ###-#### (1:30 pour). Pending special inspection.
|
BLD13-02637
| BLD-Ceiling Grid Inspection | 12/19/2013 | 12/20/2013 | 12/20/2013 2:24:04 PM | P | PASS |
|
|
bob Phone #: ###-####
|
BLD13-00645
| BLD-Final | 12/20/2013 | 12/20/2013 | 12/20/2013 2:11:50 PM | P | PART |
|
|
jason Phone #: ###-####. Needs public works sign off, then ok for temp occ. Front counter not installed, Need final lettter from special inspection agency.
|
GCB13-00146
| GCB-Energy | 12/20/2013 | 12/20/2013 | 12/20/2013 1:24:19 PM | P | PASS |
|
|
All framing have been resolved as well.
|
GCB13-00139
| GCB-Shearwall | 12/19/2013 | 12/20/2013 | 12/20/2013 10:51:10 AM | A | FAIL |
|
|
Mike ###-####. Provide engineering with approved plans. Engineer to review capacity of the STDH14 straps in lieu of the lstHD8 as shown on approved plans, also provide a staple conversion were staples were used on type 1 shear walls in leiu of nails. No cover at this time.
|
GCB13-00146
| GCB-Energy | 12/19/2013 | 12/20/2013 | 12/20/2013 9:19:29 AM | A | CANC |
|
|
Chee ###-####. Moved to pm inspection.
|
ESC13-01071
| General Inspection | 12/20/2013 | 12/20/2013 | 12/20/2013 9:18:57 AM | A | PASS |
|
|
|
BLD13-02929
| BLD-Framing/Rough-in | 12/18/2013 | 12/20/2013 | 12/20/2013 9:16:38 AM | A | PASS |
|
|
cameron Phone #: ###-####
|
BLD13-02929
| BLD-Energy code compliance | 12/20/2013 | 12/20/2013 | 12/20/2013 9:15:51 AM | A | PASS |
|
|
cameron Phone #: ###-####
|