ESC13-01172
| Site Preparation | 12/20/2013 | 12/20/2013 | 12/20/2013 4:45:29 PM | P | PASS |
|
|
Pulled the correction notice off of this permit. Earth Work was performed over the stop work order to the adjacent lot, in which contractor attempted to "burry" the previous concrete washout. Once that lot is permitted, contractor shall remove the old concrete washout and debris from the site
|
ESC13-00941
| Site Preparation | 12/20/2013 | 12/20/2013 | 12/20/2013 2:49:13 PM | P | PART |
|
|
Met on site with RP. He stated he will post SWPPP/City's ESC Sign and install straw waddles. Once finished, they will call PDS to schedual another inspection for monday
|
ESC13-01172
| Site Preparation | 12/19/2013 | 12/20/2013 | 12/20/2013 12:00:34 PM | A | CANC |
|
|
Grant Phone #: ###-#### had to reschedual for this afternoon
|
ESC13-00941
| Site Preparation | 12/19/2013 | 12/20/2013 | 12/20/2013 11:58:39 AM | A | CANC |
|
|
sanford Phone #: ###-#### Had to reschedual for this afternoon
|
ESC13-00862
| Site Preparation | 12/19/2013 | 12/20/2013 | 12/20/2013 11:49:50 AM | A | PASS |
|
|
bobby Phone #: ###-####
|