BLD16-03389
| BLD-Final | 12/19/2016 | 12/20/2016 | 12/20/2016 4:31:38 PM | P | PASS |
|
|
Other trade reinspects in AM. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm OK for Perm Occ.
|
BLD13-02945
| BLD-Final | 12/19/2016 | 12/20/2016 | 12/20/2016 4:00:32 PM | P | NR |
|
|
Matt Phone #: ###-####-please call with a meet time Need Electr final.
|
BLD16-01754
| BLD-Final | 12/19/2016 | 12/20/2016 | 12/20/2016 4:00:03 PM | P | PEND |
|
|
bill Phone #: ###-#### Looked at footing. pressure treated window jamb. engineering from MTI showing rebar Etc Meets Hillside Ord. OK to final when gravel and trim installed.
|
BLD16-01848
| BLD-Conference | 12/19/2016 | 12/20/2016 | 12/20/2016 2:16:00 PM | A | DONE |
|
|
colby Phone #: ###-#### Met with Colby and Mech Contractor.
|
BLD16-03568
| BLD-Final | 12/20/2016 | 12/20/2016 | 12/20/2016 2:15:13 PM | P | PASS |
|
|
Dave Phone #: ###-#### OK for Perm Occ.
|
BLD16-03569
| BLD-Final | 12/20/2016 | 12/20/2016 | 12/20/2016 2:14:46 PM | P | PASS |
|
|
Dave Phone #: ###-####
|
BLD16-03569
| DOC - Permit Finaled | 12/20/2016 | 12/20/2016 | 12/20/2016 2:14:32 PM | P | PASS |
|
|
|
BLD16-03896
| BLD-Wall Bracing | 12/20/2016 | 12/20/2016 | 12/20/2016 1:25:36 PM | P | PASS |
|
|
Sena-would like as later as possible Phone #: ###-#### Footing for patio post.....OK.
|
BLD16-04503
| BLD-Framing/Rough-in | 12/19/2016 | 12/20/2016 | 12/20/2016 11:08:16 AM | A | PASS |
|
|
Tom Phone #: ###-####
|
BLD15-03873
| BLD-Final | 12/19/2016 | 12/20/2016 | 12/20/2016 9:47:09 AM | A | NH |
|
|
Scott Phone #: ###-#### Notified Scott.
|
BLD16-03801
| BLD-Final | 12/16/2016 | 12/20/2016 | 12/20/2016 9:32:06 AM | A | PASS |
|
|
David Phone #: ###-####
|
BLD16-03801
| DOC - Permit Finaled | 12/20/2016 | 12/20/2016 | 12/20/2016 9:31:55 AM | P | PASS |
|
|
|