PLM16-01690
| Water Heater Final | 12/20/2016 | 12/20/2016 | 12/20/2016 5:05:51 PM | P | FAIL |
|
|
1. Remove the flex connector from the T&P valve and hard pipe. 2. Only one flex connector on each side of the water connections to the water heater. Hard pipe cold and hot water line and connect with a maximum on one 24" connector.
|
PLM16-04197
| Other | 12/20/2016 | 12/20/2016 | 12/20/2016 3:13:55 PM | P | PART |
|
|
Met with K2 Mike Clay, job Super. Looked at the groundwork for thn two new back to back bathrooms and new drinking fountain. Buss to send pictures of the test.
|
PLM16-03850
| Final | 12/19/2016 | 12/20/2016 | 12/20/2016 11:20:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Walter
|
PLM16-04618
| Water Heater Final | 12/19/2016 | 12/20/2016 | 12/20/2016 10:49:49 AM | A | PASS |
|
|
Please call Jaime before arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Guzman
|
PLM16-04612
| Final | 12/19/2016 | 12/20/2016 | 12/20/2016 10:49:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kassy Goodwin
|
PLM15-02801
| Water Heater Final | 12/14/2016 | 12/20/2016 | 12/20/2016 9:31:27 AM | A | PASS |
|
|
Contact is Chris. Phone #: ###-#### Inspection requested via web by Julie Dobransky
|
PLM15-03821
| Final | 12/16/2016 | 12/20/2016 | 12/20/2016 9:05:32 AM | A | PASS |
|
|
first call
|
PLM16-04232
| Plumbing Rough-in | 12/19/2016 | 12/20/2016 | 12/20/2016 8:05:53 AM | P | CANC |
|
|
50422 Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes Inspection cancelled from web by: Ann Marie Reyes
|