Inspections for the day of: Thursday, December 20, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-02576 Electrical Rough-In12/20/201812/20/201812/21/2018 7:08:59 AMPPASS
Building C Units 100, 101, 200, 201, 300, 301 soffit rough in
Contact Scott Wilson
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Hard lids ok to cover
ELE18-03281 Final12/20/201812/20/201812/20/2018 2:05:34 PMPPASS
Should be unlocked, please call if it isn’t. Phone #: ###-#### Inspection requested via web by Dustin Kuester
Final ok, Occ card not on site
ELE18-03224 Electrical Rough-In12/20/201812/20/201812/20/2018 2:05:01 PMPPASS
Contact: Wes Powell... underground inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden
U/G from transformer
ELE18-04735 Permanent Service12/19/201812/20/201812/20/2018 12:55:31 PMPPASS
p/s o/h rec ok
ELE18-04179 Final12/19/201812/20/201812/20/2018 12:02:19 PMACANC
Small remodel in building 24A Phone #: ###-#### Inspection requested via web by Eric Landberg
Final ok
ELE18-03375 Electrical Rough-In12/18/201812/20/201812/20/2018 11:59:12 AMAPASS
Ceiling Inspection for cover in B17C Executive Suite
Contact Ron Chaney
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek

Ceiling only ok to cover
ELE18-04168 Final12/19/201812/20/201812/20/2018 11:03:10 AMAPASS
Final inspection for outdoor kitchen any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller
Final ok
ELE18-04793 Rough-In Permanent Service12/19/201812/20/201812/20/2018 9:53:47 AMAPASS
Need to have inspection complete to schedule idaho power for power swap.
Phone #: ###-#### Inspection requested via web by Dylan Pierce
addition ok to cover of garage and other rooms(will clone a fail for above panel to insure THHN conductors are placed in a raceway)
p/s u/g n ok
ELE18-04793 Electrical Rough-In12/20/201812/20/201812/20/2018 9:53:33 AMPFAIL
Need to have inspection complete to schedule idaho power for power swap.
Phone #: ###-#### Inspection requested via web by Dylan Pierce
Space above panel has free ran THHN conductors not in a raceway and will need to be refeed or placed in a listed raceway before cover ....
ELE18-04621 Permanent Service12/19/201812/20/201812/20/2018 9:32:24 AMAPASS
#4 ground wire goes to main water line in crawl space, then continues on to ground rods. Hot and Cold water lines are bonded together at the water heater. I can send you a picture of that in case no-one is there to let you inside. Phone #: ###-#### Inspection requested via web by Troy Cobb
p/s o/h rec ok
ELE18-04572 Permanent Service12/19/201812/20/201812/19/2018 11:49:19 AMPCANC
Perm Service Inspection for service upgrade any questions please call Jordan at ###-#### Phone #: ###-#### >> Inspection requested via web by Louis Keller Inspection cancelled from web by: Louis Keller