FIR18-00926
| INSP-Sprinkler Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 3:28:08 PM | P | PASS |
|
|
Early rough-in passed.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00856
| INSP-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 3:27:38 PM | A | PART |
|
|
We tested the new dry pipe valves which passed. The nitrogen gererator is installed but is cycling excesivly as per discussion with the sprinkler contractor. I have contacted my supervisory and the fire dept for guidance.
Phone #: ###-#### Inspection requested via web by Chris Gregory
|
FIR18-00901
| INSP-Sprinkler Rough-in | 12/20/2018 | 12/20/2018 | 12/20/2018 2:51:16 PM | P | PASS |
|
|
Cover inspection for IBR Stub out passed. Piping/IBR can be covered.
Please call ROY, with time frame. Thanks and have a great day. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR18-00913
| INSP-Sprinkler Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 2:02:50 PM | P | FAIL |
|
|
No underground supply piping has even been installed yet per the general contractor
Contact Keith Orahood ###-#### 30 Min prior to UG RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
NAF18-00128
| INSP-Sprinkler Rough-in | 12/18/2018 | 12/20/2018 | 12/20/2018 1:47:18 PM | P | FAIL |
|
|
Was only able to do a partial inspection due to numerous pipe routing changes. I also noted that alot of additional fittings have been added that might affect the hydraulic calculations. I also noted tenting issues in the garage area. Contractor will need to contact plan review and see if as-builts or plan modifications are required. This will need to be done prior to another inspection being scheduled. Per the general contractor blow-in insulation will be used above the ceilings in the garage.
Call prior to going Phone #: 2084212181 >> Inspection requested via mobile web by Brian
|
FIR18-00510
| INSP-Sprinkler Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 12:46:19 PM | A | CANC |
|
|
Cancel per Brian
Town homes Phone #: ###-#### Inspection requested via web by Sam Ball
|
BLD18-02535
| FIRE-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 11:27:27 AM | A | CANC |
|
|
Not ready per Sarah Phone #: ###-####
|
FIR18-00731
| INSP-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 11:11:39 AM | A | CANC |
|
|
Went to project but it was not ready.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00491
| INSP-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 11:09:49 AM | A | CANC |
|
|
Went to project site but it is not ready.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00814
| INSP-Sprinkler Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 10:19:05 AM | A | PART |
|
|
Tenting and rough in passed for the most part. One area in the Master Bedroom needs tenting repaired prior to cover and cpvc piping compatibility with the insulation spray foam needs to be verified prior to cover on any of the vertical sprinkler lines. All other areas can be covered. The control valve under the riser needs to be removed
. Please call about an hour ahead so me and the contractor can meet with you. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR17-00603
| INSP-Sprinkler Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 9:22:22 AM | A | PASS |
|
|
The piping above the two south side restrooms is ok for cover.
|
NAF18-00127
| INSP-Final | 12/18/2018 | 12/20/2018 | 12/20/2018 6:52:06 AM | A | DONE |
|
|
Permit finaled
6:30 AM inspection for Fred Meyer in Garden City. Store opens at 7am. Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
FIR18-00767
| INSP-Final Inspection | 12/17/2018 | 12/20/2018 | 12/18/2018 9:43:30 AM | A | CANC |
|
|
This inspection will be with our technician Eric Nelson ###-####. Phone #: ###-#### >> Inspection requested via web by Cheyenne Zumstein Inspection cancelled from web by: Cheyenne Zumstein
|