Inspections for the day of: Thursday, December 20, 2018.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00385 General Inspection12/20/201812/20/201812/21/2018 3:41:31 PM CANC
ESC17-01791 Site Final12/20/201812/20/201812/21/2018 3:40:39 PMPCANC
Tyler would like this permit finaled Phone #: ###-####

rescheduled for 12/24
ESC18-00171 General Inspection12/20/201812/20/201812/21/2018 12:30:59 PM CANC
rescheduled for 12/24
MIS18-00472 ESC-Conference12/20/201812/20/201812/20/2018 2:27:53 PMPPEND
Grading work without permits reported Phone #: ###-####

Geotechnical investigation authorized by parcel owner including 13 test pits in various locations. Work conducted by All West Engineering and L3 equipment operator. Soil samples and percolation tests using water are being done. Work to occur Thurdsay 20 and Friday the 21st.

After the operation is complete excavation pits are to be filled back in, install erosion controls, revegetation, and stabilization shall be required to prevent slope erosion and to contain loose sediment.

No ESC permit is required at this time, ESC division will be working with operator and parcel owner to stabilize disturbed areas. No other work is approved or allowed. Follow up inspection scheduled.
MIS18-00470 ESC-Conference12/20/201812/20/201812/20/2018 12:00:00 AMPCANC