PLM99-04031
| Final | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 11:54:19. Contact: ###-####. Final ok.
|
PLM99-03832
| Plumbing Rough-in | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 13:25:23. Contact: ###-####. R/I ok.
|
PLM99-04168
| Plumbing Rough-in | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | PASS |
|
|
###-####. R/I ok with tub and shower valved secured.
|
PLM99-02290
| Final | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 14:16:58. Contact: ###-####. Trim incomplete.
|
PLM99-03476
| Groundwork | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 16:12:42. Contact: ###-####. Tests failed.
|
PLM98-03510
| Final | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | FAIL |
|
|
Provide cooler drain, dishwasher drain to be indirect, air gap T&P drain, pipe RP drain over open hub, 3 compartment sink waste to be plumbed with approved fittings with an air gap.
|
PLM99-03731
| Final | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | FAIL |
|
|
Graig ###-####. Provide access to all fixtures.
|
PLM99-03750
| Final | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
craig ###-####. Final ok.
|
PLM99-03810
| Final | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
craig ###-####. Final ok.
|
PLM99-04160
| Water and/or Sewer | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
###-####- Brian. S/W final ok.
|
PLM99-04177
| Groundwork | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
raul ###-#### ground work. G/W ok.
|
PLM99-03205
| Final | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
###-####. Final ok.
|
PLM99-03207
| Final | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | FAIL |
|
|
###-####. Complete kitchen sink waste.
|
PLM99-03208
| Final | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
###-####. final ok.
|
PLM99-03025
| Other | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/21/1999 at 11:24:45. Contact: ###-####. Gutter drain conference submittal from eng. required.
|
PLM99-03500
| Plumbing Rough-in | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
R/I ok.
|
PLM99-02290
| Final | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
Final ok with 2-lavs and 1- utility sink as future fixtures. Plumber will repermit and call for inspection when ready.
|