ELE99-03085
| Final | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 11:46:13. Contact: ###-####. NEC: 2108 (a) (3) outdoor GFCI recepticles. NEC: 370-20. Boxes shall be flush with combustible material called contractor.
|
ELE99-04530
| Electrical Rough-In | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | PART |
|
|
Alloway Electric- ###-####. Conference room & corner office Ele. R/I, walls.
|
ELE99-04531
| Electrical Rough-In | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | PART |
|
|
3- offices Ele. R/I; walls.
|
ELE99-04539
| Electrical Rough-In | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
###-#### Offices Ele. R/I.
|
ELE99-04540
| Rough-In Permanent Service | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
brandon ###-#### r/i I serv. ELE. R/I; Perm/svc.
|
ELE99-04545
| Temporary Service | 12/21/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | P | PASS |
|
|
###-####. Temporary pole.
|