BLD99-03168
| FIRE-Final Inspection | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 09:28:17. Contact: ###-####. Foundation fire inspection not required.
|
BLD99-00252
| FIRE-Final Inspection | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 11:09:53. Contact: ###-####. Housd should be structural inspection.
|
BLD99-02806
| FIRE-Sprinkler Rough-in | 12/20/1999 | 12/21/1999 | 12/21/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 13:39:13. Contact: ###-####. Ok to cover restroom after structural inspection of fire stops.
|