Inspections for the day of: Thursday, December 21, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-04339 Water and/or Sewer12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
PLM00-04339 Water and/or Sewer12/20/200012/21/200012/21/2000 12:00:00 AMACANC
PLM00-04340 Water and/or Sewer12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
Brett ###-####
PLM00-04340 Water and/or Sewer12/20/200012/21/200012/21/2000 12:00:00 AMACANC
Brett ###-####
PLM00-04344 Water and/or Sewer12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
###-####
PLM00-04344 Sprinkler (Final)12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
PLM00-04324 Plumbing Rough-in12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/20/2000 at 14:27:48. Contact: ###-####.
PLM00-04324 Plumbing Rough-in12/20/200012/21/200012/21/2000 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 12/20/2000 at 14:27:48. Contact: ###-####.
PLM00-04030 Final12/21/200012/21/200012/21/2000 12:00:00 AMPPASS
Dean ###-####
PLM99-03767 Final12/21/200012/21/200012/21/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/21/2000 at 10:13:42. Contact: 97419522. t&p drain in unit 12 incomplete, condensate piping in south section and unit 12 incomplete, unit 15 branch tailpiece in lav waste on the wrong side of the trap, wc in 2nd floor s. section s.e. corner leaks bad, broken cpvc adpt. on t&p in the 3rd floor unit s. section n.e. corner. 12/22/2000 11:46:58 AM
PLM99-03767 Final12/21/200012/21/200012/21/2000 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 12/21/2000 at 10:13:42. Contact: 97419522.
PLM00-03202 Groundwork12/20/200012/21/200012/20/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/20/2000 at 11:59:48. Contact: ###-####. trench drain to basement north west corner 12/20/2000 2:46:40 PM