Inspections for the day of: Thursday, December 21, 2000.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE00-04361 Electrical Rough-In12/20/200012/21/200012/21/2000 12:00:00 AMAPART
###-####. out-building ok for insulation, service panel location pending (warm-wall). 12/21/2000 11:52:12 AM
ELE00-04855 Electrical Rough-In12/20/200012/21/200012/21/2000 12:00:00 AMAPART
###-####. ufer grounding conductor ok for concrete pour. 12/21/2000 11:50:50 AM
ELE00-02183 Electrical Rough-In12/20/200012/21/200012/21/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/20/2000 at 14:24:58. Contact: ###-####. 1st and 2nd floor ele r/i remodel. 12/21/2000 5:16:02 PM
ELE00-04785 Final12/21/200012/21/200012/21/2000 12:00:00 AMPPASS
###-####. ufer grounding conductor ok for pour. 12/21/2000 12:00:08 PM
ELE00-04037 Final12/21/200012/21/200012/21/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/21/2000 at 10:04:06. Contact: ###-####. tenant improvement offices;3 rd floor completed. 12/21/2000 5:14:49 PM
ELE00-04856 Electrical Rough-In12/21/200012/21/200012/21/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/21/2000 at 10:09:09. Contact: ###-####. addition, ok. 12/21/2000 11:59:37 AM
ELE00-00669 Final12/21/200012/21/200012/21/2000 12:00:00 AMPPART
partial final interior corridor fire escape Daryl ###-####. temporary occupancy only; 1st floor, lobby and stairtower. 2nd thru 6th floors, corridors and stairtower. 12/21/2000 5:12:42 PM
ELE00-04840 Final12/20/200012/21/200012/20/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/20/2000 at 16:14:54. Contact: ###-####. completed on: 12/20/00. 12/21/2000 11:49:14 AM