MEC00-04439
| Final | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | A | PART |
|
|
FN -BRENT ###-#### FIREPLACE ONLY
rouph only ok 12/21/2000 10:07:51 AM
|
BLD00-03310
| BLD-Footing | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 13:30:50. Contact: ###-####.
|
MEC00-04301
| Rough-in | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 14:10:32. Contact: ###-####.
|
MEC00-04301
| Pressure Test | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 14:10:59. Contact: ###-####.
|
BLD00-03225
| BLD-Framing/Rough-in | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | A | PASS |
|
|
FR INSP -DENNIS ###-####
int. walls ok to cover, 12/21/2000 10:06:03 AM
|
BLD99-03665
| BLD-Final | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 14:52:45. Contact: ###-####.
c of o signed, verify other sign offs, ok for perm. occ. if others are ok 12/21/2000 10:40:31 AM
|
MEC00-04364
| Final | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | A | PASS |
|
|
James Plane ###-####
|
BLD00-03236
| BLD-Footing | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | A | PART |
|
|
FT INSP ROBIN ###-####
already poured slab w/ ftgs 12/21/2000 11:07:48 AM
|
BLD99-03557
| BLD-Final | 12/21/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | A | PASS |
|
|
Rec'd special inspection letter and ok for perm. occ. cert.
|
BLD00-02943
| BLD-Wall cover | 12/19/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 11:55:23. Contact: ###-####.
energy code ok 12/21/2000 1:27:08 PM
|
BLD00-03378
| BLD-Framing/Rough-in | 12/21/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-01953
| BLD-Framing/Rough-in | 12/21/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 415 On 12/21/2000 10:41:33 AM
conf. only, need trades signed off 12/21/2000 2:35:03 PM
|
BLD00-02945
| BLD-Framing/Rough-in | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 14:57:11. Contact: ###-####.
c/n posted, ok to insulate after electrical rouph 12/21/2000 1:29:14 PM
|
BLD00-02945
| BLD-Energy code compliance | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 14:57:42. Contact: ###-####.
energy seal ok, recall for insulation 12/21/2000 1:28:09 PM
|
MEC00-04441
| Final | 12/20/2000 | 12/21/2000 | 12/21/2000 12:00:00 AM | P | PASS |
|
|
###-####
|