Inspections for the day of: Thursday, December 21, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-04428 Final12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/20/2000 at 11:08:11. Contact: ###-####.--CALL 1ST BEFORE INSP ###-####- HOME PRO -- OR ARLAN ###-####
BLD00-00867 BLD-Final12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
KAY ###-#### FN c/c issued 12/21/2000 11:32:55 AM
BLD00-02805 BLD-Final12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
FOR THE BASEMENT KAY ###-#### -- FN c/c issued 12/21/2000 11:33:25 AM
MEC00-04363 Final12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
SHANNA ###-#### FOR F/P
MEC00-04363 Pressure Test12/20/200012/21/200012/21/2000 12:00:00 AMAPASS
GAS LINE SHANNA-- ###-####
BLD00-02232 BLD-Framing/Rough-in12/20/200012/21/200012/21/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/20/2000 at 14:46:51. Contact: ###-####. 12/21/2000 2:14:54 PM ok to insulate 12/21/2000 2:15:25 PM
BLD00-03108 BLD-Framing/Rough-in12/20/200012/21/200012/21/2000 12:00:00 AMPPASS
Chuck ###-####
BLD00-03086 BLD-Final12/21/200012/21/200012/21/2000 12:00:00 AMPFAIL
fn insp-brian ###-#### need window changed to tempered glass 12/21/2000 2:50:12 PM
BLD00-00663 BLD-Framing/Rough-in12/21/200012/21/200012/21/2000 12:00:00 AMPPASS
shear Brian ###-#### need engineering for two hold downs one se one nw corner of bldg ok to cover if they use a inter type hold down 12/21/2000 1:31:30 PM