BLD00-03538
| BLD-Framing/Rough-in | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/20/2001 at 08:19:37. Contact: ###-####....see c/n, need eng's letter/ok 12/21/2001 11:58:25 AM
|
BLD00-03538
| BLD-Final | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/20/2001 at 08:20:37. Contact: ###-####.
|
BLD01-00234
| BLD-Wall cover | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/20/2001 at 10:28:08. Contact: ###-####. unable to contact at this time. 12/21/2001 7:07:59 PM
|
BLD98-03705
| BLD-Concrete | 12/19/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 07:20:07. Contact: .work stopped due to equip. failure; met w/ Chuck Rausch & Alan Gammel, req'd design eng'r to review soils test methodology...KSF #'s for caisson end bearing must be generated br MTI 12/21/2001 7:05:40 PM
|
BLD01-02771
| BLD-Framing/Rough-in | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | PART |
|
|
above ceiling insp dave ###-####...add firesafing at window areasper plan note 14.
chk at final 12/21/2001 2:39:52 PM
|
BLD01-02028
| BLD-Conference | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | PASS |
|
|
###-####...w/ arch & bldr...grid ok to chk at final...need eng's statement re shell. 12/21/2001 11:28:01 AM
|
BLD00-01649
| BLD-Final | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 340 On 12/20/2001 6:12:14 PM ...need engs report, etc. 12/21/2001 6:47:58 PM
|
BLD00-03729
| BLD-Conference | 12/21/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 12/21/2001 9:46:24 AM w/ cm co....submit alt exiting to plan chk
|
BLD98-03705
| BLD-Conference | 12/21/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 12/21/2001 11:45:03 AM w/ Dave Cram of MTI...need eng's (d'Amato & Conversano) ok for soils methodology; verify actual brg pressures encountered vs. req'd.
|
BLD01-02742
| BLD-Final | 12/21/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 340 On 12/21/2001 11:34:59 AM ADA, door hdwe, other insps sigs.
|
BLD00-03538
| BLD-Framing/Rough-in | 12/21/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/21/2001 7:01:47 PM c/n issued, complete stair shafts, rails, glazing, rec'd const. joint firestop info, will review...need spec. insp/eng's reports.
|
BLD01-02724
| BLD-Conference | 12/21/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/21/2001 7:09:25 PM w/ bldr re rated walls, floor penetrations.
|
BLD01-02724
| BLD-Conference | 12/21/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/21/2001 7:09:25 PM w/ bldr re rated walls, floor penetrations.
|
BLD01-03006
| BLD-Framing/Rough-in | 12/21/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | P | PART |
|
|
###-#### walls ok pend elec 12/21/2001 6:43:52 PM
|
BLD01-02742
| BLD-Final | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | P | FAIL |
|
|
###-####; keep c/n, complete work 12/21/2001 4:12:10 PM
|
BLD01-02581
| BLD-Final | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | P | NR |
|
|
jim ###-#### recall 12/21/2001 4:12:27 PM
|
BLD01-02028
| BLD-Final | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | P | NR |
|
|
late late pm ###-####
|
BLD00-03729
| BLD-Foundation | 12/20/2001 | 12/21/2001 | 12/21/2001 12:00:00 AM | P | PART |
|
|
###-#### pend mti report 12/21/2001 2:44:35 PM
|