BLD03-02187
| FIRE-Conference | 12/21/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | A | PART |
|
|
Met with GC, architect and Dave H. about changing the 2 hour wall - told them to get with PDS plan review for submittals/approval prior to changing approved plans 12/21/2004 11:06:50 AM
|
FIR03-00395
| INSP-Conference | 12/20/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | A | CANC |
|
|
Request 10:00 AM if possible. This is a final inspection of a Kitchen Hood fire suppression system.; Phone #: ###-#### Internet Inspection Request from: Michael Heath Talked to Alex and this will be rescheduled 12/21/2004 11:07:14 AM
|
FIR03-00405
| INSP-Final Inspection | 12/20/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | A | CANC |
|
|
Request 8:30 AM if possible. This is a final inspection of two Kitchen Hood fire suppression system.; Phone #: ###-#### Internet Inspection Request from: Michael Heath Talked to Alex and this will be rescheduled 12/21/2004 11:07:29 AM
|
BLD04-02866
| FIRE-Final Inspection | 12/20/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 3:07:12 PM. Contact: ###-####. 12/21/2004 2:13:20 PM Fire sprinklers overspaced in office 12/21/2004 2:14:32 PM
|
FIR04-00674
| INSP-Sprinkler Rough-in | 12/21/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | P | PART |
|
|
Adam; Phone #: ###-#### Internet Inspection Request from: Jan Rice Okay to cover hard lid areas; need as-builts turned in as minor changes have been made due to duct work, etc; the 2 inch has shifted and some branch lines were rerouted 12/21/2004 1:52:35 PM
|
BLD04-02042
| FIRE-Final Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | P | PASS |
|
|
Phil; Phone #: ###-#### Internet Inspection Request from: Jan Rice Verify that a new emergency light is added in NW seating as shown on plans 12/21/2004 11:46:21 AM
|
BLD04-02635
| FIRE-Final Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | P | PASS |
|
|
shannon-- ###-####--pending structural
|
FIR04-00656
| INSP-Sprinkler Rough-in/Hydro | 12/21/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | P | CANC |
|
|
rough to cover 1 and 2 floor. Please call 1 hour prior to arrival. Thank you; Phone #: ###-#### Internet Inspection Request from: Trent Bice Rescheduled for 12/22 am 12/21/2004 4:21:54 PM
|
BLD04-01267
| FIRE-Conference | 12/21/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/21/2004 at 10:34:24 AM. Contact: ###-####. Dave Miller approved the relocation of the roof access to above stair door - there is no equipment on the roof that will need access; will require structural review also 12/21/2004 4:03:22 PM
|
FIR04-00705
| INSP-Sprinkler Rough-in | 12/21/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | P | PASS |
|
|
Contact: Terry; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Installed per plans; final okay 12/21/2004 2:53:47 PM
|
BLD04-01663
| BLD-Final | 12/21/2004 | 12/21/2004 | 12/21/2004 12:00:00 AM | P | CANC |
|
|
Fire not required for sign-off 12/21/2004 11:31:07 AM
|