FIR04-00684
| INSP-Sprinkler Rough-in | 12/21/2005 | 12/21/2005 | 12/22/2005 8:18:06 AM | P | DEFR |
|
|
Inspection to be completed 12/ 22 per agreement with contractor.
|
BLD05-02928
| FIRE-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 5:04:40 PM | P | FAIL |
|
|
Repair exit sign at south exit corridor; existing access controlled egress door must meet requirements of IFC 2003 1008.1.3.4.. See correction notice for details.
|
BLD05-02927
| FIRE-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 5:00:21 PM | P | FAIL |
|
|
Repair exit sign; failed to function on battery backup. Remaining items satisfactory.
|
BLD05-00011
| FIRE-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 3:24:08 PM | A | CANC |
|
|
Per contractor the fire alarm is not ready for final inspection, life safety cannot be approved prior to alarm final.
|
FIR05-00595
| INSP-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 3:22:33 PM | A | NR |
|
|
Per contractor job is not ready for inspection, work is incomplete.
|
FIR05-00618
| INSP-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 3:21:23 PM | A | NR |
|
|
Per contractor job is not ready for inspection, work is incomplete.
|
FIR05-00754
| INSP-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 3:10:26 PM | A | FAIL |
|
|
Two dampers failed to close upon smoke detection, strobe in the new office is not in sync with the remainder of the floor strobes, discussed this situation with the contractor for pending remodel on this floor.
|
FIR05-00236
| INSP-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 3:06:02 PM | A | FAIL |
|
|
Strobe in the staff break room is blocked by a wall not shown on plans, coverage in this area is incomplete, relocate or add an additional device, all other items tested okay.
|
FIR05-00676
| INSP-Alarm Testing | 12/20/2005 | 12/21/2005 | 12/21/2005 11:09:08 AM | A | FAIL |
|
|
A door has been added from the assembly area to the storage room disrupting the occupancy separation, this area will now require connection to the voice evac. and visual notification as well. No inspection until plans have been resubmitted and approved with required changes reflecting correct floor plan as installed.
|
FIR05-00493
| INSP-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 10:26:52 AM | A | PASS |
|
|
Required correction has been completed, fire sprinkler permit finaled.
|
FIR05-00746
| INSP-Sprinkler Rough-in/Hydro | 12/20/2005 | 12/21/2005 | 12/21/2005 9:50:36 AM | A | PART |
|
|
Rough-in at vending, excersise, guest laundry, kitchen and corridor are acceptable to cover, two locations at service laundry are overspaced-see approved plans for locations.
|