Inspections for the day of: Wednesday, December 21, 2005.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03070 BLD-Footing12/20/200512/21/200512/21/2005 3:07:04 PMPPART
###-#### Larry Note: 2:00 pm is possible. Confirmed with geo-tech engineer that garage footings were acceptable.
BLD05-01859 BLD-Energy code compliance12/21/200512/21/200512/21/2005 2:44:12 PMPPART
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. East half only. No tenant for west half. Did perform framing inspection on west half of bldg. Informred contractor that the energy code for building envelope would have to be completed to get shell permit finaled. Also noted to contractor to call in TI permit for framing on east half for interior walls.
BLD05-01493 BLD-Final12/20/200512/21/200512/21/2005 1:30:44 PMPFAIL
anthony; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Needs to place address numbers, install smoke seal and 20 min rated door at garage. c/n posted.
BLD05-01832 BLD-Final12/20/200512/21/200512/21/2005 9:34:47 AMAPASS
BLD05-01776 BLD-Framing/Rough-in12/20/200512/21/200512/21/2005 9:18:23 AMAFAIL
randy ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to provide approved plans and complete truss engineering. c/n posted.
BLD05-01832 DOC - Permit Finaled12/21/200512/21/200512/21/2005 12:00:00 AMPPASS
Work appears to be in compliance with all city codes and ordinances.
BLD05-01860 BLD-Framing/Rough-in12/21/200512/21/200512/21/2005 12:00:00 AMPPASS
Interior walls.