ESC09-00656
| Random Inspection | 12/21/2009 | 12/21/2009 | 12/21/2009 5:06:07 PM | P | FAIL |
|
|
Mike phone Talked with RP Mike.....clean up all hard surfaces and install secondary protection at drain inlet located at corner of Hemingway and ......... South of this address.
|
BLD09-02255
| BLD-Framing/Rough-in | 12/21/2009 | 12/21/2009 | 12/21/2009 5:02:54 PM | P | NR |
|
|
Carlos Phone #: ###-#### Conf........
|
BLD09-01843
| BLD-Energy code compliance | 12/18/2009 | 12/21/2009 | 12/21/2009 5:02:06 PM | A | PASS |
|
|
Larry Phone #: ###-####
|
MIS09-00040
| BLD-Final | 12/18/2009 | 12/21/2009 | 12/21/2009 4:53:28 PM | A | PASS |
|
|
Miguel Pozzos Phone #: ###-####
|
MIS09-00040
| DOC - Permit Finaled | 12/21/2009 | 12/21/2009 | 12/21/2009 4:53:05 PM | P | PASS |
|
|
|
MIS09-00169
| BLD-Final | 12/18/2009 | 12/21/2009 | 12/21/2009 11:42:17 AM | A | PASS |
|
|
Connie phone
|
MIS09-00169
| DOC - Permit Finaled | 12/21/2009 | 12/21/2009 | 12/21/2009 11:42:00 AM | P | PASS |
|
|
|
BLD05-02332
| BLD-Final | 12/18/2009 | 12/21/2009 | 12/21/2009 11:39:31 AM | A | NR |
|
|
Talked to Steve Baker.....Slow progress still working on interior....WIP
|
ESC09-00250
| Site Final | 12/18/2009 | 12/21/2009 | 12/21/2009 11:30:17 AM | A | NR |
|
|
Need to complete landscaping.
|