Inspections for the day of: Wednesday, December 21, 2011.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02323 FIRE-Final Inspection12/20/201112/21/201112/22/2011 6:41:16 AMPPART
Verified additional emergency lighting at the parking garage levels for buildings 2 and 3.
FIR11-00496 INSP-Sprinkler Rough-in12/20/201112/21/201112/21/2011 1:55:15 PMAPART
1st floor corridor 110 main and branch line tie-ins passed rough-in. Additional coverage at one area and missing seismic bracing to be verified when complete- ref. dated annotation.
FIR11-00587 INSP-Sprinkler Rough-in12/20/201112/21/201112/21/2011 1:51:58 PMAPART
See areas on stamped plans marked and dated for rough-in approved at the new MRI room and west building addition.
FIR11-00591 INSP-Final Inspection12/20/201112/21/201112/21/2011 1:47:16 PMAPASS
Final walkthrough completed satisfactory. Fire sprinkler permit finaled.
FIR11-00534 INSP-Final Inspection12/20/201112/21/201112/21/2011 12:38:15 PMPNR
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
BLD11-02069 FIRE-Final Inspection12/20/201112/21/201112/21/2011 11:13:47 AMAPASS
Correction item verified for completion. Life safety finaled.
BLD06-02323 FIRE-Final Inspection12/19/201112/21/201112/20/2011 4:28:48 PMACANC
Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton