FIR12-00557
| INSP-Final Inspection | 12/20/2012 | 12/21/2012 | 12/21/2012 5:23:52 PM | P | CANC |
|
|
Rand Phone #: ###-####
|
FIR12-00694
| INSP-Sprinkler Rough-in/Hydro | 12/21/2012 | 12/21/2012 | 12/21/2012 5:23:20 PM | P | PART |
|
|
Overhead fire sprinkler work approved for ceiling cover.
|
FIR12-00385
| INSP-Final Inspection | 12/21/2012 | 12/21/2012 | 12/21/2012 5:22:19 PM | P | PASS |
|
|
Final fire sprinkler inspection completed.
|
FIR12-00707
| INSP-Alarm Testing | 12/20/2012 | 12/21/2012 | 12/21/2012 5:21:20 PM | P | PASS |
|
|
|
FIR12-00706
| INSP-Alarm Testing | 12/20/2012 | 12/21/2012 | 12/21/2012 5:21:00 PM | P | PASS |
|
|
|
BLD12-01103
| FIRE-Final Inspection | 12/20/2012 | 12/21/2012 | 12/21/2012 1:51:38 PM | A | PASS |
|
|
Scope of work completed. Fire life safety inspection passed.
|
FIR12-00637
| INSP-Sprinkler Rough-in | 12/20/2012 | 12/21/2012 | 12/21/2012 1:50:40 PM | A | PART |
|
|
Remainder of the underground fire supply line including the ductile stub-in are approved for bury. See plans for dated annotations.
|
BLD12-03217
| FIRE-Final Inspection | 12/18/2012 | 12/21/2012 | 12/21/2012 1:47:26 PM | A | FAIL |
|
|
Actual floorplan does not match the permit documents, door hardware and exit signage needs revised.
|
FIR12-00661
| INSP-Sprinkler Rough-in | 12/20/2012 | 12/21/2012 | 12/21/2012 1:44:32 PM | A | PART |
|
|
Inspection for cold cavity protection of the fire sprinkler system at the second floor completed acceptable.
|
BLD12-03216
| FIRE-Final Inspection | 12/18/2012 | 12/21/2012 | 12/21/2012 1:42:03 PM | A | PASS |
|
|
Life safety inspection completed satisfactory. PFE to be attatched to the reception counter wall as discussed.
|