Inspections for the day of: Friday, December 21, 2012.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00678 BLD-Energy code compliance12/21/201212/21/201212/21/2012 4:47:45 PMPPASS
BLD12-02070 BLD-Final12/21/201212/21/201212/21/2012 4:35:29 PMPPASS
Jim Phone #: ###-####
BLD12-02070 DOC - Permit Finaled12/21/201212/21/201212/21/2012 4:35:23 PMPPASS
BLD12-02719 BLD-Final12/21/201212/21/201212/21/2012 3:45:16 PMPPASS
All issues resolved. ok for perm occ.
BLD12-02686 BLD-Wall Bracing12/21/201212/21/201212/21/2012 3:37:57 PMPPASS
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Exterior wall bracing only ok.
BLD12-02686 BLD-Framing/Rough-in12/21/201212/21/201212/21/2012 3:37:14 PMPFAIL
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Airseal pacage must be completed prior to framing inspection, Provide full length header over window in laundry room, strap top plate at gas pipe penetration, Strap double 1.75x11.7/8 LVL to 6x6 post, provide truss layout planfireblock ceiling furdown @ closet behind staircase,Provide blocking one joist space to LSTA strap per attached engineering, Entry stairway tall wall to be framed at 12" o.c. per attached engineering (#4) Correction notice posted, do not insulate.
ESC12-01010 General Inspection12/21/201212/21/201212/21/2012 3:32:24 PMPPASS
BLD12-02719 BLD-Final12/18/201212/21/201212/21/2012 1:48:09 PMPFAIL
john Phone #: ###-####. Handrail to return into wall at bottom of stairs and provide mirrors and ada signs for restroom.
BLD12-02869 BLD-Energy code compliance12/20/201212/21/201212/21/2012 10:49:42 AMAPASS
steve Phone #: ###-####. rigid foam insulation on interior side of stemwall.
ESC12-00818 Site Final12/21/201212/21/201212/21/2012 10:05:45 AMADONE
ESC12-00818 DOC - Permit Finaled12/21/201212/21/201212/21/2012 10:05:37 AMPPASS
BLD12-02164 BLD-Final12/20/201212/21/201212/21/2012 10:05:21 AMAPASS
jared Phone #: ###-####
BLD12-02164 DOC - Permit Finaled12/21/201212/21/201212/21/2012 10:05:05 AMPPASS
ESC12-00793 Site Final12/21/201212/21/201212/21/2012 9:50:43 AMADONE
ESC12-00793 DOC - Permit Finaled12/21/201212/21/201212/21/2012 9:50:34 AMPPASS
BLD12-02070 BLD-Final12/19/201212/21/201212/21/2012 9:50:20 AMAFAIL
Chris Phone #: ###-####. Provide blower door test and post results. Provide required energy cert.
BLD12-01141 BLD-Footing12/20/201212/21/201212/21/2012 9:21:16 AMAPASS
tim Phone #: ###-#### - call prior to going. Footings at new tube steel columns.
BLD12-00678 BLD-Energy code compliance12/20/201212/21/201212/21/2012 9:13:22 AMAFAIL
I was hoping to have Mike out first thing in the morning to do an energy inspection so I can get the hanger going..Thanks Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
BLD12-00685 BLD-Footing12/20/201212/21/201212/21/2012 9:11:46 AMAPASS
Please look at footings for car port post

If possible please come as early as possible, they want to pour those in the morning.

Thankyou for your support Phone #: ###-#### >> Inspection requested via web by Kelly Perryman