ESC12-01162
| Site Preparation | 12/21/2012 | 12/21/2012 | 12/21/2012 6:11:14 PM | | PASS |
|
|
|
ESC12-00859
| Aging Inspection | 12/21/2012 | 12/21/2012 | 12/21/2012 1:27:49 PM | | PART |
|
|
Site has not achieved vegitative coverage at this time.
|
ESC12-00447
| Site Preparation | 12/17/2012 | 12/21/2012 | 12/21/2012 10:54:31 AM | A | FAIL |
|
|
Developement is complete. All disturbed soil is not stabilized. The listed RP cound not be reached today. From the last conversation, the listed RP does not have day to day control of the project. We have not had a valid RP list yet on the porject.
|
ESC12-00077
| General Inspection | 12/21/2012 | 12/21/2012 | 12/21/2012 10:52:35 AM | | PASS |
|
|
|
ESC12-00619
| Aging Inspection | 12/21/2012 | 12/21/2012 | 12/21/2012 10:52:26 AM | | PART |
|
|
Daily clean up is required.
|
ESC11-00879
| Tracking Control | 12/17/2012 | 12/21/2012 | 12/21/2012 9:41:39 AM | A | PART |
|
|
Explained to RP that daily clean up is require to keep hard surfaces free of any sediment asnd debris.
|
ESC12-00644
| General Inspection | 12/18/2012 | 12/21/2012 | 12/21/2012 9:40:52 AM | A | PASS |
|
|
|
ESC11-00732
| General Inspection | 12/21/2012 | 12/21/2012 | 12/21/2012 8:38:50 AM | | PART |
|
|
Still using for stockpiling of pit run.
|
ESC12-00929
| General Inspection | 12/21/2012 | 12/21/2012 | 12/21/2012 8:38:25 AM | | PASS |
|
|
All area of disturbed soil have had mulch, seed and tachifier applied.
|
ESC11-00176
| General Inspection | 12/21/2012 | 12/21/2012 | 12/21/2012 7:42:21 AM | | PASS |
|
|
Per my previous visit yesterday, the devlopement project is compliant.
|