ELE17-03217
| Final | 12/21/2018 | 12/21/2018 | 12/21/2018 2:54:35 PM | P | PASS |
|
|
trying to close out permit Final ok
|
ELE18-04814
| Rough-In Permanent Service | 12/21/2018 | 12/21/2018 | 12/21/2018 2:35:08 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Chris Berthelot 210.70(A)(3)- Storage space under stairs shall ahve a lighting outlet installed controlled by a wall switch. 300.15- All NM cables shall terminate in a box or enclosure. Powder bath off entry not made up and up vacuum outlet. 334.12- NM calbe shall not be installed where subject to damage. 14-2 resting on fireplace. Provide clearance.
|
ELE17-04116
| Final | 12/20/2018 | 12/21/2018 | 12/21/2018 1:42:25 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by ERIC CENTERS Pool and landscaping covered by seperate permit ELE18-04803. Final ok
|
ELE18-04745
| Conference | 12/14/2018 | 12/21/2018 | 12/21/2018 12:00:16 PM | A | PASS |
|
|
Initial walk through on existing unfinished building to verify required items for final. ###-#### call Neil 30 minutes prior to meet Mountain Home Electric permit level 3 ele15-02278. Rough in no final. Oldest plans found on site dated 2008. Wall removed at level 1 at top of stair to basement. All outdoor emergency lighting missing at each exit, emergency lighting for stairs moved to top and bottom of stair instead of mid level as drawn. Life safety will determine if lighting sufficient. Breaker blanks needed to level 1 panel. Elevator or lift room not being installed.
|
ELE18-03818
| Final | 12/20/2018 | 12/21/2018 | 12/21/2018 11:52:41 AM | A | PASS |
|
|
Rod Tomlinson is the contact - Thank you Phone #: ###-#### Inspection requested via web by Vicki Moore Final ok
|
ELE18-03818
| Electrical Rough-In | 12/21/2018 | 12/21/2018 | 12/21/2018 11:52:31 AM | P | PASS |
|
|
Rod Tomlinson is the contact - Thank you Phone #: ###-#### Inspection requested via web by Vicki Moore Ground rod and fused at ground box. Rough in ok
|
ELE18-03820
| Final | 12/20/2018 | 12/21/2018 | 12/21/2018 11:51:22 AM | A | PASS |
|
|
Rod Tomlinson is the contact Phone #: ###-#### Inspection requested via web by Vicki Moore Final ok
|
ELE18-03820
| Final | 12/21/2018 | 12/21/2018 | 12/21/2018 11:50:57 AM | P | PASS |
|
|
Rod Tomlinson is the contact Phone #: ###-#### Inspection requested via web by Vicki Moore Fused and ground rod at ground box. Rough in ok
|
ELE18-02369
| Electrical Rough-In | 12/21/2018 | 12/21/2018 | 12/21/2018 11:06:33 AM | P | PASS |
|
|
Contractor called and asked if ok to 1-side electrical rooms only. OK to cover 1 side of 2 electrical rooms only rough in ok cover
|
ELE18-01608
| Electrical Rough-In | 12/20/2018 | 12/21/2018 | 12/21/2018 9:44:45 AM | A | PASS |
|
|
Inspect underground conduit for cover Phone #: ###-#### Inspection requested via web by Jeremy Cloud Excavator asked for permission to cover roadways trying to keep accesses open. Told no cover with out the ok from electrical contractor. Underground at east and west areas of west buildings as noted and dated on contractor print.
|
ELE18-04801
| Electrical Rough-In | 12/21/2018 | 12/21/2018 | 12/21/2018 9:02:51 AM | A | PASS |
|
|
please call me a half hour before on site to help with finding the room in the building. Phone #: ###-#### Inspection requested via web by Jim Noll This permit for TI space level 3. 5 floor boxes and repair damaged wall rough in ok cover
|