BLD00-03506
| BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | FAIL |
|
|
Larry Hayes ###-#### cell ###-####, called left msg; no cards, plans onsite 12/22/2000 11:20:42 AM
|
BLD00-02394
| BLD-Other | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 09:46:56. Contact: ###-####. conf only w/ Kelly, new proj. mgr. 12/22/2000 10:13:27 AM
|
BLD00-02682
| BLD-Framing/Rough-in | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | PART |
|
|
PER JIM SLY FIRE WALL BETWEEN HOUSE & TRAILER- BEN ###-####. reasigned by 325.
|
BLD00-00077
| BLD-Energy code compliance | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | FAIL |
|
|
###-####, frame c/n issued 12/22/2000 11:22:27 AM
|
BLD00-00081
| BLD-Framing/Rough-in | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 11:39:01. Contact: ###-####. conf only w/ proj. mgr. 12/22/2000 10:13:57 AM
|
MEC00-04368
| Rough-in | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 12:37:28. Contact: ###-####. no access, $42 fee due 12/22/2000 10:15:13 AM
|
MEC00-04368
| Pressure Test | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 12:38:00. Contact: ###-####. padlocked... 12/22/2000 10:15:38 AM
|
BLD99-00270
| BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | PASS |
|
|
FN OCC -BOB-- ###-####
|
BLD00-03310
| BLD-Foundation | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 13:00:38. Contact: .walls ok 12/22/2000 9:46:26 AM
|
BLD00-03507
| BLD-Footing | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | PART |
|
|
###-####, found ok, ok to relocate hds per change to plans at windows 12/22/2000 11:22:01 AM
|
BLD00-03478
| BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | PASS |
|
|
Peter, ###-#### - call 1st so he can meet you there - Bank of America Center, okto sign at office for c/o 12/22/2000 2:52:23 PM
|
BLD00-02170
| BLD-Footing | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | PART |
|
|
Garry ###-####; pend spec. insp reports 12/22/2000 10:14:24 AM
|
BLD00-02773
| BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | A | PART |
|
|
Don Bryant, ###-####, ok t/o, keep c/n per 408 12/22/2000 1:42:11 PM
|
BLD00-00771
| BLD-Footing | 12/22/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 08:12:34. Contact: ###-####.elev. area ok 12/22/2000 2:53:29 PM
|
BLD00-03605
| BLD-Footing | 12/22/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 08:21:49. Contact: .bar in place...nobody onsite 12/22/2000 3:29:02 PM
|
BLD00-00994
| BLD-Framing/Rough-in | 12/22/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | P | PART |
|
|
SHEAR WALL --CALL 1ST BEFORE INSP MIKE- ###-#### , int gyp..add6d at 7" oc at sills, ok to cover 12/22/2000 3:19:06 PM
|
BLD00-02025
| BLD-Framing/Rough-in | 12/22/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | P | PART |
|
|
R/I KIM -- ###-#### MEC CONNECTIONS IN BALLROOM CEILING JOIST ok to cover that area. need fire sprinkler analysis for existing shafts w/ exposed combustibles 12/22/2000 1:44:21 PM
|
MEC00-04400
| Final | 12/22/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | P | NH |
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 09:45:31. Contact: ###-####.no access 12/22/2000 3:46:05 PM
|
MEC00-04400
| Pressure Test | 12/22/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | P | NH |
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 09:46:05. Contact: ###-####. gage at 22...no access 12/22/2000 3:46:56 PM
|
BLD99-02572
| BLD-Conference | 12/22/2000 | 12/22/2000 | 12/22/2000 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/22/2000 3:56:02 PM w bldr, call insp for tenants...supply copies of eng's/spec. insp affidavit letters re shell & seismic upgrades,file misplaced??? c/n issued re lobby/ bsmt stair rails
|