Inspections for the day of: Friday, December 22, 2000.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03506 BLD-Final12/21/200012/22/200012/22/2000 12:00:00 AMAFAIL
Larry Hayes ###-#### cell ###-####, called left msg; no cards, plans onsite 12/22/2000 11:20:42 AM
BLD00-02394 BLD-Other12/21/200012/22/200012/22/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/21/2000 at 09:46:56. Contact: ###-####. conf only w/ Kelly, new proj. mgr. 12/22/2000 10:13:27 AM
BLD00-02682 BLD-Framing/Rough-in12/21/200012/22/200012/22/2000 12:00:00 AMAPART
PER JIM SLY FIRE WALL BETWEEN HOUSE & TRAILER- BEN ###-####. reasigned by 325.
BLD00-00077 BLD-Energy code compliance12/21/200012/22/200012/22/2000 12:00:00 AMAFAIL
###-####, frame c/n issued 12/22/2000 11:22:27 AM
BLD00-00081 BLD-Framing/Rough-in12/21/200012/22/200012/22/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 12/21/2000 at 11:39:01. Contact: ###-####. conf only w/ proj. mgr. 12/22/2000 10:13:57 AM
MEC00-04368 Rough-in12/21/200012/22/200012/22/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/21/2000 at 12:37:28. Contact: ###-####. no access, $42 fee due 12/22/2000 10:15:13 AM
MEC00-04368 Pressure Test12/21/200012/22/200012/22/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 12/21/2000 at 12:38:00. Contact: ###-####. padlocked... 12/22/2000 10:15:38 AM
BLD99-00270 BLD-Final12/21/200012/22/200012/22/2000 12:00:00 AMAPASS
FN OCC -BOB-- ###-####
BLD00-03310 BLD-Foundation12/21/200012/22/200012/22/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/21/2000 at 13:00:38. Contact: .walls ok 12/22/2000 9:46:26 AM
BLD00-03507 BLD-Footing12/21/200012/22/200012/22/2000 12:00:00 AMAPART
###-####, found ok, ok to relocate hds per change to plans at windows 12/22/2000 11:22:01 AM
BLD00-03478 BLD-Final12/21/200012/22/200012/22/2000 12:00:00 AMAPASS
Peter, ###-#### - call 1st so he can meet you there - Bank of America Center, okto sign at office for c/o 12/22/2000 2:52:23 PM
BLD00-02170 BLD-Footing12/21/200012/22/200012/22/2000 12:00:00 AMAPART
Garry ###-####; pend spec. insp reports 12/22/2000 10:14:24 AM
BLD00-02773 BLD-Final12/21/200012/22/200012/22/2000 12:00:00 AMAPART
Don Bryant, ###-####, ok t/o, keep c/n per 408 12/22/2000 1:42:11 PM
BLD00-00771 BLD-Footing12/22/200012/22/200012/22/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/22/2000 at 08:12:34. Contact: ###-####.elev. area ok 12/22/2000 2:53:29 PM
BLD00-03605 BLD-Footing12/22/200012/22/200012/22/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/22/2000 at 08:21:49. Contact: .bar in place...nobody onsite 12/22/2000 3:29:02 PM
BLD00-00994 BLD-Framing/Rough-in12/22/200012/22/200012/22/2000 12:00:00 AMPPART
SHEAR WALL --CALL 1ST BEFORE INSP MIKE- ###-#### , int gyp..add6d at 7" oc at sills, ok to cover 12/22/2000 3:19:06 PM
BLD00-02025 BLD-Framing/Rough-in12/22/200012/22/200012/22/2000 12:00:00 AMPPART
R/I KIM -- ###-#### MEC CONNECTIONS IN BALLROOM CEILING JOIST ok to cover that area. need fire sprinkler analysis for existing shafts w/ exposed combustibles 12/22/2000 1:44:21 PM
MEC00-04400 Final12/22/200012/22/200012/22/2000 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 12/22/2000 at 09:45:31. Contact: ###-####.no access 12/22/2000 3:46:05 PM
MEC00-04400 Pressure Test12/22/200012/22/200012/22/2000 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 12/22/2000 at 09:46:05. Contact: ###-####. gage at 22...no access 12/22/2000 3:46:56 PM
BLD99-02572 BLD-Conference12/22/200012/22/200012/22/2000 12:00:00 AMPPART
Added by Inspector: 340 On 12/22/2000 3:56:02 PM w bldr, call insp for tenants...supply copies of eng's/spec. insp affidavit letters re shell & seismic upgrades,file misplaced??? c/n issued re lobby/ bsmt stair rails