Inspections for the day of: Monday, December 22, 2003.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-02297 BLD-Aging Inspection12/22/200312/22/200312/22/2003 12:00:00 AM NR
no requist for insp. 12/22/2003 8:02:08 AM
BLD03-02563 BLD-Footing12/19/200312/22/200312/22/2003 12:00:00 AMANR
Scheduled by a contractor via Hello! on 12/19/2003 at 9:20:32 AM. Contact: ###-####.
BLD03-02254 BLD-Footing12/19/200312/22/200312/22/2003 12:00:00 AMANR
Scheduled by a contractor via Hello! on 12/19/2003 at 9:22:49 AM. Contact: ###-####.
BLD03-02811 BLD-Concrete12/19/200312/22/200312/22/2003 12:00:00 AMANR
Scheduled by a contractor via Hello! on 12/19/2003 at 9:25:48 AM. Contact: ###-####.
BLD03-02711 BLD-Framing/Rough-in12/19/200312/22/200312/22/2003 12:00:00 AMAPART
Louis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes framing ok pending plm and ele sign offs. 12/22/2003 9:18:44 AM
MEC03-03628 Final12/22/200312/22/200312/22/2003 12:00:00 AMAPASS
BLD03-02447 BLD-Framing/Rough-in12/21/200312/22/200312/22/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/21/2003 at 8:25:03 PM. Contact: ###-####. truss bearing at garage east warm wall/misc. fire blk./ ridge board to heel cut/ revise mech-check. apply sealent plk. 12/22/2003 4:51:48 PM
BLD03-01690 BLD-Framing/Rough-in12/19/200312/22/200312/22/2003 12:00:00 AMPPASS
Troy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
MEC03-03641 Final12/22/200312/22/200312/22/2003 12:00:00 AMPPASS
call 1st before insp....ray-###-#### call 1st before insp
BLD03-02563 BLD-Footing12/22/200312/22/200312/22/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/19/2003 at 9:20:32 AM. Contact: ###-####. steel erection in progess weldinh in progess special insp pending/ appears to be per aproved plan. 12/22/2003 2:36:04 PM
BLD03-02254 BLD-Footing12/22/200312/22/200312/22/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/19/2003 at 9:22:49 AM. Contact: ###-####. wip 12/22/2003 2:44:22 PM
BLD03-02811 BLD-Concrete12/22/200312/22/200312/22/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/19/2003 at 9:25:48 AM. Contact: ###-####. wip 12/22/2003 2:45:01 PM
MEC03-03614 Pressure Test12/22/200312/22/200312/22/2003 12:00:00 AMPPASS
###-#### out of tags used old metal tag inside by furn. 12/22/2003 2:17:41 PM