FIR03-00642
| INSP-Final Inspection | 12/19/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/19/2003 at 10:10:16 AM. Contact: ###-####. need smoke detector above FACP; NAC #2 was reversed so the EOL is on device #1 and not #6 12/22/2003 8:58:43 AM
|
FIR03-00753
| INSP-Sprinkler Rough-in | 12/19/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | A | PASS |
|
|
###-#### jeff okay to cover; minor modifications to layout to meet tile/light layout; no more than 2 heads off 1 inch; will close this out at final 12/22/2003 11:07:38 AM
|
BLD03-00436
| FIRE-Final Inspection | 12/19/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | PART |
|
|
phased project - okay to occupy the south half of 14th floor; second exit to be maintained 12/22/2003 4:15:08 PM
|
BLD03-00653
| FIRE-Final Inspection | 12/19/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | PASS |
|
|
Nick; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIR03-00616
| INSP-Sprinkler Rough-in/Hydro | 12/22/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | PART |
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes peak and northside lower area tented okay; electrical work still in progress on the south lower side - not tented yet 12/22/2003 3:18:08 PM
|
BLD02-02853
| FIRE-Final Inspection | 12/22/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | NR |
|
|
will need to verify emergency lighting to occupy the north half of the 3rd floor as part of phasing this project 12/22/2003 2:59:55 PM
|
FIR03-00356
| INSP-Final Inspection | 12/22/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | PASS |
|
|
|
FIR03-00445
| INSP-Final Inspection | 12/18/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | PART |
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes tested north side of third floor - okay; will need to test the duct detectors when ready 12/22/2003 2:53:08 PM
|