Inspections for the day of: Monday, December 22, 2003.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00206 INSP-Sprinkler Rough-in/Hydro12/19/200312/22/200312/22/2003 12:00:00 AMAPASS
Overhead sprinkler system hydro test is ok 12/22/2003 12:39:00 PM
FIR03-00594 INSP-Sprinkler Rough-in/Hydro12/22/200312/22/200312/22/2003 12:00:00 AMPPART
Underground supply line flush is OK. For the sprinkler rough-in the upright sprinkler branchlines in the center section are overspaced, provide nipple extender for upright sprinkler head blocked by overhead door hardware on the south side, provide high temp head in front of unit heater, reinstall hanger in the southeast office, provide insulation on bottom chords of trusses in fab area so pendants could operate 12/22/2003 3:27:20 PM
BLD02-01071 FIRE-Final Inspection12/22/200312/22/200312/22/2003 12:00:00 AMPCANC
rescheduled for tomorrow 12/22/2003 3:10:52 PM
BLD02-02717 FIRE-Final Inspection12/22/200312/22/200312/22/2003 12:00:00 AMPCANC
rescheduled for tomorrow 12/22/2003 3:11:02 PM
MIS03-00242 FIR-Final12/22/200312/22/200312/22/2003 12:00:00 AMPFAIL
repair exit sign/emergency light and remove locking hardware from the door with the emergency exit hardware 12/22/2003 1:27:39 PM
BLD02-02454 FIRE-Final Inspection12/22/200312/22/200312/22/2003 12:00:00 AMPFAIL
provide "no parking fire lane" text on the fire lane curbing, install door hardware and building address, secure new area from the existing area before a temp occupancy is signed 12/22/2003 4:12:08 PM
FIR03-00594 INSP-Sprinkler Rough-in/Hydro12/22/200312/22/200312/22/2003 12:00:00 AMPPART
24 hour test for the dry system started at 2:00 and had 40 psi on the guage