FIR03-00206
| INSP-Sprinkler Rough-in/Hydro | 12/19/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | A | PASS |
|
|
Overhead sprinkler system hydro test is ok 12/22/2003 12:39:00 PM
|
FIR03-00594
| INSP-Sprinkler Rough-in/Hydro | 12/22/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | PART |
|
|
Underground supply line flush is OK. For the sprinkler rough-in the upright sprinkler branchlines in the center section are overspaced, provide nipple extender for upright sprinkler head blocked by overhead door hardware on the south side, provide high temp head in front of unit heater, reinstall hanger in the southeast office, provide insulation on bottom chords of trusses in fab area so pendants could operate 12/22/2003 3:27:20 PM
|
BLD02-01071
| FIRE-Final Inspection | 12/22/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | CANC |
|
|
rescheduled for tomorrow 12/22/2003 3:10:52 PM
|
BLD02-02717
| FIRE-Final Inspection | 12/22/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | CANC |
|
|
rescheduled for tomorrow 12/22/2003 3:11:02 PM
|
MIS03-00242
| FIR-Final | 12/22/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | FAIL |
|
|
repair exit sign/emergency light and remove locking hardware from the door with the emergency exit hardware 12/22/2003 1:27:39 PM
|
BLD02-02454
| FIRE-Final Inspection | 12/22/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | FAIL |
|
|
provide "no parking fire lane" text on the fire lane curbing, install door hardware and building address, secure new area from the existing area before a temp occupancy is signed 12/22/2003 4:12:08 PM
|
FIR03-00594
| INSP-Sprinkler Rough-in/Hydro | 12/22/2003 | 12/22/2003 | 12/22/2003 12:00:00 AM | P | PART |
|
|
24 hour test for the dry system started at 2:00 and had 40 psi on the guage
|