FIR04-00656
| INSP-Sprinkler Rough-in | 12/21/2004 | 12/22/2004 | 12/22/2004 12:00:00 AM | A | PART |
|
|
See on site city approved plans for locations where it is ok to cover sprinkler pipingAreas include 1st, 2nd and 3rd floors. 1 1/2" piping at elevator on 1st floor has been installed as 2" and 1 1/4" piping on the second floor has been installed as 1 1/2". Resubmit plans with changes for approval prior to permit being finaled. 12/22/2004 10:27:08 AM
|
FIR04-00656
| INSP-Sprinkler Rough-in/Hydro | 12/22/2004 | 12/22/2004 | 12/22/2004 12:00:00 AM | P | PASS |
|
|
Hangers on 1st floor and overspaced head fixed. Piping is ok to cover as marked on approved plans. Approved plans did not include approval notes. Inspection to be called in for review of notes for possible changes. 12/22/2004 3:36:57 PM
|