ESC05-01343
| Site Preparation | 12/22/2005 | 12/22/2005 | 12/22/2005 3:19:47 PM | P | PART |
|
|
Maintain drop inlet, access controls, proper installation on sediment barriers.
|
ESC05-00411
| Site Preparation | 12/22/2005 | 12/22/2005 | 12/22/2005 3:18:58 PM | P | PART |
|
|
Maintain drop inlet, stake wattles, access controls.
|
ESC05-01342
| Site Preparation | 12/22/2005 | 12/22/2005 | 12/22/2005 3:18:16 PM | P | PART |
|
|
Need proper installation of sediment barriers and access control plus maintance on drop inlets.
|
ESC05-01628
| Complaint Inspection | 12/22/2005 | 12/22/2005 | 12/22/2005 3:02:25 PM | P | FAIL |
|
|
Major mud/dirt trackout onto franklin rd. ACHD had informed rp, Masco to address earlier today. STOP WORK issued. Implement plan and call for an inspection with Boise City Erosion control prior to any additional work.
|
ESC05-01253
| BMP Violation | 12/22/2005 | 12/22/2005 | 12/22/2005 12:00:00 AM | P | FAIL |
|
|
Lack of maintance of drop inlet bmp has caused flooding on Boise Ave. Informed rp and contractor to correct. Remove drop inlet protection because area next to sidewalk has been resodded. Will follow up; Phone #: ###-####
|