Inspections for the day of: Tuesday, December 22, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00554 BMP Violation12/18/200912/22/200912/23/2009 4:43:03 PMAPART
Verbal to GC:
Scrape and sweep up project area where the staging area is located going out to Allumbaugh street. Will re-inspect on 12/23/09AM.
ESC09-00352 Conference12/21/200912/22/200912/22/2009 10:19:57 PMPDONE
Went over the design and the schedule that will be implimented for the erection of the lntake station at the south east end of the porject area. Waiting on the submital of the amendment to the SWPPP(erosion control plan) prior to the start date of the station.
ESC09-00470 BMP Violation12/21/200912/22/200912/22/2009 3:58:34 PMPPASS
ESC09-00775 Site Preparation12/15/200912/22/200912/22/2009 1:24:42 PMANR
ESC09-00743 Site Preparation12/15/200912/22/200912/22/2009 11:27:27 AMAPASS
ESC09-00756 BMP Violation12/18/200912/22/200912/22/2009 10:45:17 AMAPASS
ESC09-00501 Tracking Control12/18/200912/22/200912/22/2009 8:56:58 AMAPART
Access has been addressed. I have explained to the GC of the project that a new RP is needed by 22/23/09AM due to the fact the the current RP is not in the loop anymore on the project. Will re-inspect on 12/23/09AM.