BLD06-02323
| FIRE-Final Inspection | 12/22/2011 | 12/22/2011 | 12/23/2011 11:09:40 AM | P | PART |
|
|
|
BLD11-01578
| FIRE-Final Inspection | 12/22/2011 | 12/22/2011 | 12/23/2011 11:08:54 AM | P | FAIL |
|
|
Field work does not match approved plans, door between the laundry and dry storage room has not been removed, door 103 is not installed, one hour rating at some locations including the new office and kitchen/corridor doors is not maintained per plan review notes and annotations, EM lighting at the common exit path from the board room and managers offices has been enclosed behind the new office wall.
|
FIR11-00571
| INSP-Final Inspection | 12/22/2011 | 12/22/2011 | 12/22/2011 5:24:28 PM | P | PART |
|
|
Verified correction items, completed forward flow, final pending control valve tampers.
|
FIR11-00676
| INSP-Final Inspection | 12/22/2011 | 12/22/2011 | 12/22/2011 4:38:06 PM | P | FAIL |
|
|
New tamper switches at the sprinkler DCVA failed to report.
|
FIR11-00638
| INSP-Sprinkler Rough-in | 12/21/2011 | 12/22/2011 | 12/22/2011 1:39:38 PM | A | PART |
|
|
Overhead rough-in passed with the exception of two pendent heads at the 2nd floor excersise room to be relocated due to ceiling fan obstructions. Inspection for cold cavity protection required prior to cover approval.
|
BLD11-01396
| FIRE-Final Inspection | 12/21/2011 | 12/22/2011 | 12/22/2011 1:36:04 PM | A | FAIL |
|
|
Correction items for fire life safety approvals include; exit door hardware at four locations, missing EM lighting at two areas, project related fire alarm and sprinkler permit finals.
|
FIR11-00534
| INSP-Final Inspection | 12/21/2011 | 12/22/2011 | 12/22/2011 1:31:25 PM | A | PART |
|
|
Final walkthrough completed including verification of previous C/N items, intermediate temp. heads at the unit heaters in the basement and missing DCVA support installed while on site, forward flow test passed. Final pending repair of the tamper switch at the PIV and project related fire alarm permit work for sprinkler monitoring.
|
FIR11-00533
| INSP-Final Inspection | 12/22/2011 | 12/22/2011 | 12/22/2011 1:26:02 PM | P | NR |
|
|
|
FIR11-00533
| INSP-Alarm Testing | 12/21/2011 | 12/22/2011 | 12/22/2011 1:25:38 PM | A | FAIL |
|
|
Yard post indicator tamper switch reported as a trouble open circut, plans do not match installation- noted five tamper switches and two flow switches have been added due to a PIV, antifreeze loop and DCVA not shown on plans, FACP has been relocated, floor control valves are now located in the riser room. Waterflow switch/outside bell repaired while on site. An approved plan modification will be necessary.
|
FIR11-00648
| INSP-Final Inspection | 12/21/2011 | 12/22/2011 | 12/22/2011 9:09:05 AM | A | PASS |
|
|
Fire alarm testing for phase 2 work completed acceptable, permit finaled.
|