Inspections for the day of: Monday, December 22, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00474 INSP-Final Inspection12/22/201412/22/201412/22/2014 3:36:29 PMAPASS
Permit finaled
FIR14-00480 INSP-Alarm Testing12/19/201412/22/201412/22/2014 3:32:17 PMADONE
Continued testing on the fire alarm system which included the fire sprinkler system interconnections. I noted several overspaced strobes and discussed the Man Trap door operation.
GCB14-00161 FIRE-Final Inspection12/22/201412/22/201412/22/2014 3:30:19 PMPFAIL
Project was not ready for a final yet. Contractor and I discussed exit sign locations and door hardware requirements.
BLD14-03158 FIRE-Final Inspection12/22/201412/22/201412/22/2014 3:29:22 PMPFAIL
No approved plans on site. I noted that the thumbturn deadbolt on the main exit will need to be removed and that keyed is ok.
FIR14-00897 INSP-Final Inspection12/19/201412/22/201412/22/2014 3:27:47 PMPFAIL
No inspection performed due to no access to the fire alarm panel. We discussed that there can be no alarm verification for hvac shut down since it is not addressed in the IMC.
BLD14-03518 FIRE-Final Inspection12/18/201412/22/201412/22/2014 12:09:31 PMAPASS
life safety passed
FIR14-00863 INSP-Sprinkler Rough-in12/19/201412/22/201412/22/2014 9:57:40 AMAPASS
Rough-in passed. Piping can be covered.
BLD14-02795 FIRE-Final Inspection12/19/201412/22/201412/22/2014 9:23:24 AMAPASS
life safety passed