FIR14-00474
| INSP-Final Inspection | 12/22/2014 | 12/22/2014 | 12/22/2014 3:36:29 PM | A | PASS |
|
|
Permit finaled
|
FIR14-00480
| INSP-Alarm Testing | 12/19/2014 | 12/22/2014 | 12/22/2014 3:32:17 PM | A | DONE |
|
|
Continued testing on the fire alarm system which included the fire sprinkler system interconnections. I noted several overspaced strobes and discussed the Man Trap door operation.
|
GCB14-00161
| FIRE-Final Inspection | 12/22/2014 | 12/22/2014 | 12/22/2014 3:30:19 PM | P | FAIL |
|
|
Project was not ready for a final yet. Contractor and I discussed exit sign locations and door hardware requirements.
|
BLD14-03158
| FIRE-Final Inspection | 12/22/2014 | 12/22/2014 | 12/22/2014 3:29:22 PM | P | FAIL |
|
|
No approved plans on site. I noted that the thumbturn deadbolt on the main exit will need to be removed and that keyed is ok.
|
FIR14-00897
| INSP-Final Inspection | 12/19/2014 | 12/22/2014 | 12/22/2014 3:27:47 PM | P | FAIL |
|
|
No inspection performed due to no access to the fire alarm panel. We discussed that there can be no alarm verification for hvac shut down since it is not addressed in the IMC.
|
BLD14-03518
| FIRE-Final Inspection | 12/18/2014 | 12/22/2014 | 12/22/2014 12:09:31 PM | A | PASS |
|
|
life safety passed
|
FIR14-00863
| INSP-Sprinkler Rough-in | 12/19/2014 | 12/22/2014 | 12/22/2014 9:57:40 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
|
BLD14-02795
| FIRE-Final Inspection | 12/19/2014 | 12/22/2014 | 12/22/2014 9:23:24 AM | A | PASS |
|
|
life safety passed
|