ELE15-03427
| Final | 12/22/2015 | 12/22/2015 | 12/22/2015 2:34:24 PM | P | CANC |
|
|
Job Foreman: Justin Hamby Phone #: ###-#### Inspection requested via web by Laurie Hoelscher Rescheduled to tomorrow AM due to holiday traffic at mall
|
ELE15-04057
| Rough-In Permanent Service | 12/21/2015 | 12/22/2015 | 12/22/2015 2:06:17 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rowdy Monroe Note on temp pole- 590.6- all 120 volt temp receptacles shall have GFCI protection. Black GFI did not trip when tested. House rough in ok cover p/s o/h n ok
|
ELE15-01468
| Electrical Rough-In | 12/22/2015 | 12/22/2015 | 12/22/2015 1:30:35 PM | P | FAIL |
|
|
Mason Phone #: ###-#### turned into another conference. Discussed 2 20 amp circuits serving kitchen counter top receptacles, dining, and pantry receptacles and shall have no other outlets. Securing NM cable with in 12 " of boxes. NM cables shall be contained in stud bays. Discussed nail plates.
|
ELE15-04060
| Rough-In Permanent Service | 12/22/2015 | 12/22/2015 | 12/22/2015 12:48:44 PM | P | FAIL |
|
|
rough-in Phone #: ###-#### Inspection requested via web by cal crosby 250.28- Main bonding jumper screw shall be installed. 300.4- NM cable and bell wire shall be protected from physical damage where ran through bored holes that do not maintain 1 1/4" from framing surface. garage outlet, garage door sensor wires. 408.7- Unused breaker spaces shall be closed.
|
ELE15-04040
| Rough-In Permanent Service | 12/21/2015 | 12/22/2015 | 12/22/2015 11:57:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson Rough in ok cover p/s u/g n ok
|
ELE15-03400
| Final | 12/22/2015 | 12/22/2015 | 12/22/2015 11:20:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Final ok
|
ELE15-03723
| Rough-In Permanent Service | 12/22/2015 | 12/22/2015 | 12/22/2015 10:46:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Rough in ok cover p/s u/g n ok
|
ELE15-03654
| Final | 12/22/2015 | 12/22/2015 | 12/22/2015 10:04:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
|
ELE15-03571
| Final | 12/22/2015 | 12/22/2015 | 12/22/2015 9:42:41 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
|
ELE15-02908
| Electrical Rough-In | 12/21/2015 | 12/22/2015 | 12/22/2015 9:31:16 AM | A | PASS |
|
|
We are requesting a hard rock ceiling inspection for the bathroom for tomorrow 12/22/15 in the AM. Our contact is Rod @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Bathroom hardlid rough in ok cover
|