BLD15-03218
| BLD-Other | 12/22/2015 | 12/22/2015 | 12/22/2015 3:01:11 PM | P | CANC |
|
|
Structural block first lift at lower footing step.
Phone #: ###-#### Inspection requested via web by Mike Walling. Moved to 12-23 in the am.
|
GCB15-00046
| GCB-Final | 12/22/2015 | 12/22/2015 | 12/22/2015 2:37:39 PM | P | PASS |
|
|
Manny ###-####. Structural final ok.
|
BLD15-00245
| BLD-Other | 12/22/2015 | 12/22/2015 | 12/22/2015 2:02:43 PM | P | PASS |
|
|
RC1 Channel; Pat Phone #: ###-####
|
BLD15-04058
| BLD-Footing | 12/21/2015 | 12/22/2015 | 12/22/2015 2:02:04 PM | P | CANC |
|
|
Dane Phone #: ###-####. Cancelled by Dane via phone call.
|
GCB15-00089
| GCB-Final | 12/18/2015 | 12/22/2015 | 12/22/2015 2:01:18 PM | P | FAIL |
|
|
Mark ###-####. Provide a lock indicator on main enterance/exit. Remove the double sided lock and provide a paddle type hardware. Base required in new ADA restroom.
|
BLD12-03170
| BLD-Conference | 12/11/2015 | 12/22/2015 | 12/22/2015 9:11:31 AM | A | DONE |
|
|
Check back. A phone call was made to speak with jonathan welch. He noted that he has purchased fire extingushers, panic hardware and exit signs. Jonathan noted that he will be installing these items over the next several days. A building conferance has been scheduled for Dec. 31st. Will meet Jonathan Welch on site and go over progress that has been made.
|