PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, December 22, 2015
.
Number of inspections:
23
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-01532
General Inspection
12/22/2015
12/22/2015
12/23/2015 4:09:22 PM
P
PASS
Limited activity along length of Greenbelt project. Dewatering system at Ann Morrison is working well with no prohibited discharge.
No trackout or muddy runoff from the staging areas. DIs installed and perimeter wattles along path sections are installed. No corrections at this time.
ESC15-01349
General Inspection
12/18/2015
12/22/2015
12/23/2015 12:08:22 PM
P
CANC
rescheduled
ESC14-00588
Site Preparation
12/21/2015
12/22/2015
12/23/2015 8:03:21 AM
P
CANC
ESC15-01068
General Inspection
12/22/2015
12/22/2015
12/22/2015 5:01:45 PM
P
PASS
CN follow up inspection. Wattle now installed along Kerr Street as requested. Sidewalk was cleaned at end of day. Oil sheen has been absorbed to a certain extent by the floor dry put down and is no longer visible in runoff down the gutter.
ESC15-01310
Complaint Inspection
12/22/2015
12/22/2015
12/22/2015 4:59:17 PM
P
PASS
Minimal trackout to Broadway observed at time of inspection. No discharges or other issues observed. Will investigate futher 12/23
ESC15-01232
Complaint Inspection
12/22/2015
12/22/2015
12/22/2015 4:59:05 PM
P
PASS
trackout and lack of BMPs reported...
Minimal trackout to Broadway observed at time of inspection. No discharges or other issues observed. Will investigate futher 12/23
ESC15-00306
General Inspection
12/22/2015
12/22/2015
12/22/2015 2:55:56 PM
CANC
rescheduled
ESC14-00572
General Inspection
12/22/2015
12/22/2015
12/22/2015 1:58:24 PM
CANC
ESC15-00065
General Inspection
12/22/2015
12/22/2015
12/22/2015 1:38:18 PM
PART
No activity at time of inspection. No windblown trash issues, trackout, or illegal parking on culdesac.
Backyard hillside has some erosion rills developing and sediment depositing in the preserved vegetation below grading. No runoff exiting site, but will need to be fixed and assessed for improvements once conditions improve.
ESC15-00024
General Inspection
12/22/2015
12/22/2015
12/22/2015 1:37:58 PM
PASS
ESC15-00868
Site Final
12/22/2015
12/22/2015
12/22/2015 1:37:05 PM
P
PASS
Work on kiosk complete. No disturbed area or construction materials. ESC permit conditions satisfied.
ESC15-00591
Aging Inspection
12/22/2015
12/22/2015
12/22/2015 1:24:21 PM
PASS
ESC15-00403
General Inspection
12/22/2015
12/22/2015
12/22/2015 1:16:34 PM
PASS
No activity at site. Seems to be inactive for over 1 month. Site security fence has been knocked down.
No trackout or discharges occuring, water retained within foundation footprint.
ESC15-01091
Random Inspection
12/22/2015
12/22/2015
12/22/2015 12:58:16 PM
P
FAIL
Need to conduct clean up of sediment and mud on sidewalk and gutter and collected at inlet. Install new inlet filter BMP.
Install perimeter wattles along the backfill adjacent to sidewalk. Has been inactive for well over 2 weeks.
Verbal CN issued to RP Michael
ESC15-00094
General Inspection
12/22/2015
12/22/2015
12/22/2015 12:54:29 PM
PASS
Hillside BMPs such as horizontal tracking, incremental wattle installations to shortening slope lengths, sediment trap berms are working well on the site. Some areas have started to vegetate where hydroseeding occured.
No erosion or sediment discharges offsite observed. Approved.
ESC15-00035
General Inspection
12/22/2015
12/22/2015
12/22/2015 11:14:28 AM
PASS
Temporary silt fence BMP is still installed at east end of project to filter sheet flow from graded lots and new alley ways. Alley DIs have inlet filters.
BMPS may possibly be utilized for future roundabout at Old Hickory.
No corrections at this time. No construction activity.
ESC15-00118
General Inspection
12/22/2015
12/22/2015
12/22/2015 10:40:22 AM
PASS
ESC15-00579
Aging Inspection
12/22/2015
12/22/2015
12/22/2015 10:10:44 AM
PASS
Project complete. ESC conditions satisfied.
ESC15-00579
DOC - Permit Finaled
12/22/2015
12/22/2015
12/22/2015 10:05:46 AM
P
PASS
ESC15-00110
Aging Inspection
12/22/2015
12/22/2015
12/22/2015 8:48:55 AM
PASS
No construction activity or disturbed area observed at site. No sediment or prohibited discharges leaving site. BLD permit open but expired. ESC finaled
ESC15-00110
DOC - Permit Finaled
12/22/2015
12/22/2015
12/22/2015 8:47:38 AM
P
PASS
ESC13-00655
DOC - Permit Finaled
12/22/2015
12/22/2015
12/22/2015 8:37:15 AM
P
PASS
ESC15-00748
Tracking Control
12/15/2015
12/22/2015
12/21/2015 10:07:07 AM
A
FAIL
reinspection
Loose mud and sediment tracked out from house to Thatcher and on sidewalk.
Verbal CN to RP Steve Hanson to clean up ASAP to prevent further muddy runoff going to storm drain.