FIR03-00283
| INSP-Final Inspection | 12/22/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | A | PASS |
|
|
This is grants cell. Thank you and have a great holiday; Phone #: ###-#### Internet Inspection Request from: Terry Owsley
|
FIR03-00775
| INSP-Final Inspection | 12/22/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | A | FAIL |
|
|
could not give a final due to no ceiling tile installed. But fire sprinklers and ok to cover 12/23/2003 9:29:19 AM
|
FIR03-00558
| INSP-Final Inspection | 12/22/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | A | PART |
|
|
Vault and two offices to the west are ok to cover 12/23/2003 10:40:30 AM
|
BLD02-01071
| FIRE-Final Inspection | 12/22/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | A | PASS |
|
|
fire alarm and fire life safety finaled 12/23/2003 11:01:24 AM
|
BLD02-02717
| FIRE-Final Inspection | 12/22/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | A | PASS |
|
|
fire alarm and fire life safety finaled 12/23/2003 11:01:36 AM
|
FIR03-00206
| INSP-Final Inspection | 12/22/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | A | PART |
|
|
A temporary occupancy was given with dave millers permission for use of the new church pending the completion of the existing church areas 12/23/2003 8:39:13 AM
|
BLD03-02251
| BLD-Conference | 12/23/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | A | DONE |
|
|
Provide suite numbers, test the existing duct smoke detectors and provide fire extinguishers
|
FIR03-00274
| INSP-Final Inspection | 12/23/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | A | PASS |
|
|
|
FIR03-00775
| INSP-Final Inspection | 12/23/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | A | PASS |
|
|
|
FIR01-00124
| INSP-Final Inspection | 12/23/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | P | FAIL |
|
|
The Ames backflow preventor is having a surging problem which won't allow the flow switch to activate. Owner needs to provide verification that the building will be provided with minimum heating for the wet sprinkler system 12/23/2003 4:28:17 PM
|
FIR03-00775
| INSP-Final Inspection | 12/23/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | P | PASS |
|
|
fire sprinklers and fire life safety finaled 12/23/2003 11:44:47 AM
|
FIR03-00594
| INSP-Sprinkler Rough-in/Hydro | 12/22/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | P | PASS |
|
|
underground hydro test and the 24 hour air test on the dry pipe system is ok 12/23/2003 3:37:24 PM
|
BLD02-02454
| FIRE-Final Inspection | 12/22/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with dave millers permission until the existing building is completed. Battery calcs, map, breaker locks and breaker box location. Existing building needs to be inspected 12/23/2003 1:23:58 PM
|
FIR03-00258
| INSP-Alarm Testing | 12/22/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with dave millers permission until the existing building is completed. Battery calcs, map, breaker locks and breaker box location. Existing building needs to be inspected 12/23/2003 1:23:42 PM
|
BLD03-02261
| FIRE-Final Inspection | 12/23/2003 | 12/23/2003 | 12/23/2003 12:00:00 AM | P | PASS |
|
|
fire life safety finaled 12/23/2003 1:24:21 PM
|