Inspections for the day of: Wednesday, December 23, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00619 INSP-Final Inspection12/22/200912/23/200912/24/2009 4:19:29 PMACANC
Please call 30 minutes prior to arrival. Phone #: ###-#### Internet Inspection Request from: Jeff Walton
FIR09-00693 INSP-Final Inspection12/22/200912/23/200912/24/2009 4:18:58 PMACANC
Overbooked
FIR09-00233 INSP-Final Inspection12/23/200912/23/200912/23/2009 5:41:16 PMPFAIL
Overspaced notification appliances at two rooms, missing notification device at one room, duct detector sample and vent tubes must be installed per mfg. cut sheet, gate valves at the sprinkler riser incorrectly reported at offsite monitoring as trouble conditions, outside bell repaired while on site. FACP phone lines, battery trouble, SD and MP at the panel tested okay.
BLD09-01906 FIRE-Final Inspection12/23/200912/23/200912/23/2009 5:33:53 PMPPASS
Fire life safety inspection passed after corrections made while on site including posting of the building address, max. occupant load sign provided, fire extinguishers attatched to the wall at locations indicated, signage at manual pulls for the two hood systems.
FIR09-00722 INSP-Final Inspection12/22/200912/23/200912/23/2009 5:30:48 PMAPASS
Hood suppression system operated correctly under test conditons.
FIR09-00657 INSP-Sprinkler Rough-in12/22/200912/23/200912/23/2009 12:55:35 PMAPART
Overhead modifications at the tenant remodel okayed for cover, noted minor field changes at one room and matched to existing heads at the common corridor are acceptable.
FIR09-00622 INSP-Final Inspection12/18/200912/23/200912/23/2009 12:52:01 PMAFAIL
Completed functional testing of duct detectors at office areas A and B, HVAC unit at the NW corner office area "A" failed to shut down (address 92), obstructed vent tubes at two locations repaired while on site, see plans for devices tested to date, discussed inspection schedule, noted some previous c/n items are incomplete.
BLD09-00824 FIRE-Final Inspection12/21/200912/23/200912/23/2009 12:42:35 PMAFAIL
Inspection intended for BLD09-00823- need to provide missing suite address numbers, repair the exit sign/EM light at the northwest man door, adjust closure at the new ADA restroom door, request correct permit number for final. Plans must match work completed for project BLD08-00824.