Inspections for the day of: Friday, December 23, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00543 INSP-Sprinkler Rough-in12/22/201112/23/201112/23/2011 3:42:17 PMAFAIL
Plan modifications are needed to show the actual pipe routings and pipe sizing used for the installation. I did approve cover on the east corridor that is against the outer walls as per Scott, the superintendant, and I's discussions. As agreed two areas need to be left uncovered to provide access to two additional upright heads that are needed. I also found overspaced heads in the mezzanine level on the south side as well as unbraced sprig ups that exceed 4'
BLD11-02607 FIRE-Final Inspection12/22/201112/23/201112/23/2011 1:16:39 PMAPASS
life safety passed. The fire exitinguishers were being hung as I left. Correct suite numbers for the spaces were on their way per Douge
BLD11-02608 FIRE-Final Inspection12/22/201112/23/201112/23/2011 1:16:27 PMPPASS
life safety passed. The fire exitinguishers were being hung as I left. Correct suite numbers for the spaces were on their way per Douge
FIR11-00619 INSP-Final Inspection12/23/201112/23/201112/23/2011 1:15:13 PMPPASS
permit finaled
FIR11-00639 INSP-Final Inspection12/23/201112/23/201112/23/2011 1:14:59 PMPPASS
permit finaled
FIR11-00566 INSP-Final Inspection12/21/201112/23/201112/23/2011 11:32:06 AMAPASS
permit finaled
FIR11-00590 INSP-Final Inspection12/21/201112/23/201112/23/2011 11:31:38 AMAPASS
permit finaled
BLD11-02704 FIRE-Final Inspection12/22/201112/23/201112/23/2011 11:12:33 AMAPASS
life safety passed