FIR11-00543
| INSP-Sprinkler Rough-in | 12/22/2011 | 12/23/2011 | 12/23/2011 3:42:17 PM | A | FAIL |
|
|
Plan modifications are needed to show the actual pipe routings and pipe sizing used for the installation. I did approve cover on the east corridor that is against the outer walls as per Scott, the superintendant, and I's discussions. As agreed two areas need to be left uncovered to provide access to two additional upright heads that are needed. I also found overspaced heads in the mezzanine level on the south side as well as unbraced sprig ups that exceed 4'
|
BLD11-02607
| FIRE-Final Inspection | 12/22/2011 | 12/23/2011 | 12/23/2011 1:16:39 PM | A | PASS |
|
|
life safety passed. The fire exitinguishers were being hung as I left. Correct suite numbers for the spaces were on their way per Douge
|
BLD11-02608
| FIRE-Final Inspection | 12/22/2011 | 12/23/2011 | 12/23/2011 1:16:27 PM | P | PASS |
|
|
life safety passed. The fire exitinguishers were being hung as I left. Correct suite numbers for the spaces were on their way per Douge
|
FIR11-00619
| INSP-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 1:15:13 PM | P | PASS |
|
|
permit finaled
|
FIR11-00639
| INSP-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 1:14:59 PM | P | PASS |
|
|
permit finaled
|
FIR11-00566
| INSP-Final Inspection | 12/21/2011 | 12/23/2011 | 12/23/2011 11:32:06 AM | A | PASS |
|
|
permit finaled
|
FIR11-00590
| INSP-Final Inspection | 12/21/2011 | 12/23/2011 | 12/23/2011 11:31:38 AM | A | PASS |
|
|
permit finaled
|
BLD11-02704
| FIRE-Final Inspection | 12/22/2011 | 12/23/2011 | 12/23/2011 11:12:33 AM | A | PASS |
|
|
life safety passed
|