BLD13-02974
| BLD-Conference | 12/23/2013 | 12/23/2013 | 12/29/2013 10:38:45 AM | P | CANC |
|
|
|
BLD13-01449
| BLD-Footing | 12/23/2013 | 12/23/2013 | 12/26/2013 7:54:03 AM | P | PASS |
|
|
Jesse // remainder of footing - gridline A between 2 & 3 and electrical interior footings Phone #: ###-####
|
BLD13-03337
| BLD-Foundation | 12/23/2013 | 12/23/2013 | 12/26/2013 7:52:57 AM | P | PASS |
|
|
lance Phone #: ###-####
|
BLD13-03164
| BLD-Framing/Rough-in | 12/20/2013 | 12/23/2013 | 12/26/2013 7:52:20 AM | A | PASS |
|
|
shane Phone #: ###-####
|
BLD13-01246
| BLD-Framing/Rough-in | 12/20/2013 | 12/23/2013 | 12/23/2013 1:01:19 PM | A | PART |
|
|
travis Phone #: ###-#### C/N posted.....draftstop, washers/nuts anchor bolts, lateral bracing top chord trusses not sheathed. OK to insulate.
|
BLD12-00152
| BLD-Foundation | 12/19/2013 | 12/23/2013 | 12/23/2013 12:56:55 PM | A | CANC |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
MIS13-00333
| BLD-Conference | 12/20/2013 | 12/23/2013 | 12/23/2013 12:01:46 PM | A | DONE |
|
|
Check back..... Same.
|